HAO Xiao di,CHEN Qiao,LI Ji,et al.Status and Trend of MBR Process Application in the World[J].China Water & Wastewater,2018,34(20):7-12.
Click Copy

Status and Trend of MBR Process Application in the World

References:

[1]郝晓地,李季,曹达啟. MBR工艺可持续性能量化评价[J]. 中国给水排水,2016,32(7):14-23.Hao Xiaodi,LI Ji,Cao Daqi. Quantitative evaluation of the sustainability of MBRs processes[J]. China Water & Wastewater,2016,32(7):14-23(in Chinese).
[2]Hao X D,Li J,Loosdrecht M C M,et al. A sustainabilitybased evaluation of membrane bioreactors over conventional activated sludge processes[J]. J Environ Chem Eng,2018,6(2):2597-2605.
[3]Skinner S. Interactive map: History of the largest municipal MBR installations[EB/OL]. http://www.thembr site.com/interactive-map-history-of-the-largest-municipal-mbr-installations,2017-11-04.
[4]Li J X,Zhang B G,Liu Y. Global research trends on membrane biological reactor (MBR) for wastewater treatment and reuse from 1982 to 2013:A bibliometric analysis[J]. Electron Lib,2016,34(6):945-957.
[5]Meng F,Chae S R,Shin H S,et al. Recent advances in membrane bioreactors:Configuration development,pollutant elimination,and sludge reduction[J]. Environ Eng Sci,2012,29(3):139-160.
[6]Krzeminski P,van der Graaf J H J M,van Lier J B. Specific energy consumption of membrane bioreactor (MBR) for sewage treatment[J]. Water Sci Technol,2012,65(2):380-392.
[7]Itokawa H,Tsuji K,Yamashita K,et al. Design and operating experiences of fullscale municipal membrane bioreactors in Japan[J]. Water Sci Technol,2014,69(5):1088-1093.
[8]Kraemer J T,Menniti A L,Erdal Z K,et al. A practitioner’s perspective on the application and research needs of membrane bioreactors for municipal wastewater treatment[J]. Bioresour Technol,2012,122:2-10.
[9]Wozniak T. Comparison of a conventional municipal plant,and an MBR plant with and without MPE[J]. Desalin Water Treat,2012,47(1/3):341-352.
[10]Zheng X,Zhou Y F,Chen S H,et al. Survey of MBR market:Trends and perspectives in China[J]. Desalination,2010,250(2):609-612.
[11]Xiao K,Xu Y,Liang S,et al. Engineering application of membrane bioreactor for wastewater treatment in China:Current state and future prospect[J]. Fron Environ Sci Eng,2014,8(6):805-819.
[12]Sun J,Liang P,Yan X,et al. Reducing aeration energy consumption in a largescale membrane bioreactor:Process simulation and engineering application[J]. Water Res,2016,93:205-213.
[13]林爽. 城市污水处理厂MBR工艺综合评价研究[D]. 北京:清华大学,2015.Lin Shuang. A Comprehensive Evaluation for Municipal Sewage Plant based MBR Technology[D]. Beijing:Tsinghua University,2015(in Chinese).
[14]Barillon B,Martin R S,Langlais C,et al. Energy efficiency in membrane bioreactors[J]. Water Sci Technol,2013,67(12):2685-2691.
[15]Iglesias R,Simón P,Moragas L,et al. Cost comparison of fullscale water reclamation technologies with an emphasis on membrane bioreactors[J]. Water Sci Technol,2017,75(11):2562-2570.
[16]Lay W C L,Lim C,Lee Y,et al. From R & D to application:Membrane bioreactor technology for water reclamation[J]. Water Practice Technol,2017,12(1):12-24.
[17]Huang X,Xiao K,Shen Y. Recent advances in membrane bioreactor technology for wastewater treatment in China[J]. Front Environ Sci Eng China,2010,4(3):245-271.
[18]陈珺,杨琦. MBR工艺应用于城市污水处理的技术风险[J]. 中国给水排水,2012,28(10):109-111.Chen Jun,Yang Qi. Technical risks of MBR process for municipal wastewater treatment[J]. China Water & Wastewater,2012,28(10):109-111(in Chinese).
[19]Brepols C,Schafer H,Engelhardt N. Considerations on the design and financial feasibility of full scale membrane bioreactors for municipal applications[J]. Water Sci Technol,2010,61(10):2461-2468.
[20]Bertanza G,Canato M,Laera G,et al. A comparison between two fullscale MBR and CAS municipal wastewater treatment plants:Technoeconomicenvironmental assessment[J]. Environ Sci Pollut Res,2017,24(2):17383-17393.
[21]Andersson S,Ek P,Berg M,et al. Extension of two large wastewater treatment plants in Stockholm using membrane technology[J]. Water Pract Technol,2016,11(4):744-753.
[22]Judd S. Henriksdal wastewater treatment plant,Stockholm,will become the world’s largest MBR facility[EB/OL]. http://www.thembrsite.com/news/henriksdal-wastewater-treatment-plant-stockholm-will-become-worlds-largest-mbr-facility,2015-03-04.
[23]郝晓地,孟祥挺,付昆明. 新加坡再生水厂能耗目标及其技术发展方向[J]. 中国给水排水,2014,30(24):7-11.Hao Xiaodi,Meng Xiangting,Fu Kunming. Targeted energy consumption and associated technologies developed in water reclamation plants in Singapore[J]. China Water & Wastewater,2014,30(24):7-11(in Chinese).

Memo

基金项目:国家自然科学基金资助项目(51578036);北京“未来城市设计高精尖中心”项目(2018)
作者简介:郝晓地(1960-),男,山西柳林人,教授,从事市政与环境工程专业教学与科研工作,主要研究方向为污水生物脱氮除磷技术、污水处理数学模拟技术、可持续环境生物技术,现为国际水协期刊《Water Research》区域主编(Editor)。
E-mail:haoxiaodi@bucea.edu.cn收稿日期:2018-05-08

Last Update: 2018-10-17