- According to the requirements of the “Threeyear Action Plan for Accelerating the Construction of Wastewater Treatment and Reclaimed Water Utilization Facilities in Beijing (2016-2019)”, the expansion project of Fatou Wastewater Treatment Plant (FWTP) has been approved for the construction, which belongs to one of the 11 wastewater treatment projects of the central city of Beijing. The current treatment capacity of the FWTP is 20 000 m3/d, and the CASS process is adopted with area coverage of 1.3 hm2. The reconstruction and expansion project is required to reach the treatment capacity of 100 000 m3/d without new land acquisition or no water stoppage. The effluent water quality will be improved from the current first level B criteria of Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB 18918-2002) to Beijing local standard grade B of Discharge Standard of Water Pollutants for Municipal Wastewater Treatment Plants(DB 11/890-2012). These requirements bring great challenges to the design of technical plan. Therefore, the principles of optimizing process, threedimensional layout and phased implementation should be implemented in the project design technical solution. Through the demonstration, a scheme was formed, which adopted the MBR process to construct the stacking or superimposing layout between structures (buildings), and was implemented them in three stages to meet the requirements of increasing the quantity of treated water, improving the effluent quality, saving land, and not stopping the water during operation.
References:
[1]GB 18918—2002,城镇污水处理厂污染物排放标准[S]. 北京:中国环境科学出版社,2002.GB 18918-2002,Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant[S]. Beijing:China Environmental Science Press,2002(in Chinese).