TONG En cong.Process Selection and Thought of Baoding Sludge Treatment Center Project[J].China Water & Wastewater,2018,34(20):21-23.
Process Selection and Thought of Baoding Sludge Treatment Center Project
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第34卷
Number:
20
Page:
21-23
Column:
Date of publication:
2018-10-18
- Article number:
- 1000-4602(2018)20-0021-03
- Keywords:
- sludge treatment; process selection; sludge treatment plant; aerobic digestion; plate dewatering
- CLC:
- TU992.3
- Document code:
- B
- Abstract:
- The treatment capacity of Baoding sludge treatment center was 300 t/d (80% moisture content). Combined with some factors in the local wastewater treatment plants such as sludge quality, total amount of sludge, geological conditions, medicament, auxiliary raw materials, energy supply condition, final sludge disposal way, after comparison and selection of aerobic fermentation, heat drying and anaerobic digestion, the combination process of anaerobic digestion and sludge dewatering was decided as the optimal solution. Through the productive experiment, the biogas production rate and the content of hydrogen sulfide and carbon dioxide was determined. The calculation of carbon dioxide emission reduction showed that the project could bring significant environmental benefits. Combined with the sludge treatment process, a new improved scheme of low carbon and energy saving was put forward for the mainstream process of wastewater treatment.〖CS〗
References:
[1]CJJ 131—2009,城镇污水处理厂污泥处理技术规程[S]. 北京:中国建筑工业出版社,2009.CJJ 131-2009,Technical Specification for Sludge Treatment of Municipal Wastewater Treatment Plant[S]. Beijing:China Architecture & Building Press,2009(in Chinese).
Memo
作者简介:仝恩从(1965-),男,河北保定人,大学本科,正高级工程师,主要从事污水处理厂建设、运行管理工作。
E-mail:pssyfzc@126.com
收稿日期:2018-04-25
Last Update:
2018-10-17