LU Ru,JU Zhi jian,DU Qiong.Upgrading and Reconstruction Project Design of Wastewater Treatment Plant with A/O Process[J].China Water & Wastewater,2018,34(20):56-59.
Click Copy

Upgrading and Reconstruction Project Design of Wastewater Treatment Plant with A/O Process

References:

[1]周雹. 活性污泥工艺简明原理及设计计算[M]. 北京:中国建筑工业出版社,2005.Zhou Bao. Simple Principle and Design Calculation of Activated Sludge Process[M]. Beijing:China Architecture & Building Press,2005(in Chinese).
[2]周丹,周雹. 污水脱氮工艺中外部碳源投加量简易计算方法[J]. 给水排水,2011,37(11):38-41.Zhou Dan,Zhou Bao. Simple calculation method for the outside carbon source dosage for nitrogen removal process in wastewater treatment[J]. Water & Wastewater Engineering,2011,37(11):38-41(in Chinese).
[3]孙淑琴,常华,李建科,等. 水厂改造工程设计与运行案例分析[J]. 净水技术,2013,32(4):90-95.Sun Shuqin,Chang Hua,Li Jianke,et al. Case analysis of design and operation for rehabilitation project of water treatment plant[J]. Water Purification Technology,2013,32(4):90-95(in Chinese).

Memo

作者简介:卢如(1987-),女,江西丰城人,硕士,工程师,主要从事市政给排水处理研究。
E-mail:303632669@qq.com
收稿日期:2018-04-18

Last Update: 2018-10-17