HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(22):66-70.
Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第34卷
Number:
22
Page:
66-70
Column:
Date of publication:
2018-11-17
- Article number:
- 1000-4602(2018)22-0066-05
- CLC:
- TU992.3
- Document code:
- C
- Abstract:
- The design treatment capacity of the upgrading and reconstruction project of Shending River Wastewater Treatment Plant was 18×104 m3/d. In the first-stage project, A/O+ secondary sedimentation tank process was adopted and the treatment capacity was reduced from 5.5×104 m3/d to 4×104 m3/d. The effluent quality of the first-stage project was required to be better than the first class B discharge standard. The design capacity of second-stage project was increased from 11×104 m3/d to 14×104 m3/d, and AAO+MBR process was adopted as the treatment technology. The effluent quality of the second-stage project should meet the first class A discharge standard. The mixed effluent of the two projects should reach the first class A discharge standard. In the period of operation, the effluent quality was proven to be better than design discharge standard.
References:
[1] 吴媛媛,张彩云,曹明浩,等. 神定河污水处理厂提标改造——CAS-MBR复合工艺[J]. 净水技术,2016,35(4):11-15,87.
Wu Yuanyuan,Zhang Caiyun,Cao Minghao,et al. Upgrading and reconstruction of Shendinghe WWTP in application of combined process of CAS-MBR[J]. Water Purification Technology,2016,35(4):11-15,87(in Chinese).
Memo
作者简介:侯晓庆(1981- ), 女, 陕西三原人, 本科, 工程师, 主要从事膜工艺设计等相关工作。
E-mail:houxiaoqing@originwater.com
收稿日期:2018-05-04
Last Update: