Schemes of Hydraulic Tunnel Backfilling Grouting and Crossing the Intensive Denudation Area below the Reservoir Water Level
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第35卷
Number:
20
Page:
118-122
Column:
Date of publication:
2019-10-17
Last Update:
2019-10-17