XU Nai-xing,CHEN Yi,LIN Xian-zhi,et al.Research on 3D Model Rapid Creation of Large Scale Sponge City Construction Based on BIM Technology[J].China Water & Wastewater,2020,36(12):111-116.
Research on 3D Model Rapid Creation of Large Scale Sponge City Construction Based on BIM Technology
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第36卷
Number:
12
Page:
111-116
Column:
Date of publication:
2020-06-17
- Keywords:
-
sponge city
; BIM; rapid font-size: 10pt; ">creation; large scale; 3D model
- Abstract:
-
Many problems exists in the traditional management of sponge city construction, such as lack of intuitive display function, information discontinuity, difficult coordination of multi -party work,etc. Based on the characteristics of the planning and construction of the sponge city, a rapid creation method for 3D model of large scale sponge city construction was put forward with the information technology such as BIM, GIS and three-dimensional real technology. Taking the project of Sanjiangkou area as a case, a three-dimensional (underground + ground) integrated model of sponge city facilities was created. Using this model as the carrier, the multi-class information of the whole life cycle process of the construction of the sponge city could be stored and integrated, and the information sharing and exploring could be realized. At the same time, the foundation for the construction of multi-professional collaborative digital design platform and multi-cooperative office could be built.
Last Update:
2020-06-17