ZHANG Li,YU Guo-fu,QU Lu,et al.Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing[J].China Water & Wastewater,2020,36(18 18):95-98.
Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第36卷
Number:
18 18
Page:
95-98
Column:
Date of publication:
2020-09-17
- Keywords:
- wastewater treatment plant; upgrading and reconstruction; improved A-A2/O; highefficiency sedimentation tank; filter
- Abstract:
- The combined process of improved A-A2/O, highefficiency sedimentation tank, and homogeneous filter was adopted to replace the original secondary treatment process of A-A2/O in a wastewater treatment plant(WWTP) in Chongqing. The secondary biological treatment capability was expanded and advanced treatment units were added to effectively remove TN, TP and SS. At present, the effluent quality has reached the first-level A standard. In view of the fact that the influent BOD5, COD, SS, TN, and etc. of the WWTP are higher than those of ordinary urban domestic sewage, the possible reasons for higher removal rates of BOD5, COD, SS, TN are analyzed, such as increasing sludge concentration in the biological tank. Suggestions are also put forward to solve the problem of seasonal algae and scum in the inclined tube sedimentation tank after upgrading.