LUO Hui-yun,ZHANG Ning.Technical Points and Case Analysis of Urban and Rural Water Supply Integrated Project[J].China Water & Wastewater,2020,36(22 22):72-76.
Technical Points and Case Analysis of Urban and Rural Water Supply Integrated Project
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第36卷
Number:
22 22
Page:
72-76
Column:
Date of publication:
2020-11-17
- Keywords:
- urban and rural water supply; centralized water supply; regional water supply; technical points
- Abstract:
- The urban and rural water supply integrated project can effectively solve the existing problems in water source, water plant, pipe network, water supply management and so on in urban and rural water supply projects (especially in rural areas). With regard to the experience of implemented projects, this paper studied the technical route of the urban and rural water supply integrated project, summarized the technical points in the implementation process. And furthermore, the project in H City was taken as an example, some aspects including the regional status analysis, general layout planning, the water supply and demand analysis, water source selection, overall scheme design and recent project determination were introduced and analyzed. Overall, this study was of great significance for other similar regions to carry out the urban and rural water supply integrated projects.
Last Update:
2020-11-17