HE Yang,YUAN Shao-chun,JIANG Bin.Design Change and Practice of Sewage Treatment Project under the Background of New Local Standards[J].China Water & Wastewater,2021,37(8 8):78-82.
Design Change and Practice of Sewage Treatment Project under the Background of New Local Standards
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第37卷
Number:
8 8
Page:
78-82
Column:
Date of publication:
2021-04-17
- Abstract:
- The total treatment capacity of the Neijiang second sewage treatment plant in Sichuan Province is 10×104 m3/d, and the design treatment capacity of the first phase is 5×104 m3/d. According to discharge requirements of Minjiang River and Tuojiang River Basin Water Pollution Discharge Standards of Sichuan Province (DB 51/2311-2016), the original combined process consisting of pretreatment, modified A2O, fiber filter and UV disinfection was changed into pretreatment, multi-stage AO, high efficiency sedimentation tank, deep bed denitrification filter and sodium hypochlorite contact disinfection. A simulation model of multi-stage AO dephosphorization and denitrification process was established by using WEST software, and optimal operational parameters were obtained. The removal efficiencies of TN, SS, TP, COD, NH3-N and BOD5 reached 81.8%, 98.3%, 94.8%, 91.1%, 97.3% and 93.3%, respectively, and the effluent quality met the discharge requirements of local standards. Design of the project was changed in time, which effectively avoided the waste of investment.
Last Update:
2021-04-17