ZHONG Wei,LI Zhi-yong,WAN Zhen-dong.Interactive Design and Collaborative Management Application of Utility Tunnel Based on BIM[J].China Water & Wastewater,2021,37(12 12):104-108.
Interactive Design and Collaborative Management Application of Utility Tunnel Based on BIM
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第37卷
Number:
12 12
Page:
104-108
Column:
Date of publication:
2021-06-17
- Keywords:
- building information modeling; utility tunnel; interactive design; collaborative management; information integration
- Abstract:
- In order to resolve the “design conflicts” in complex spaces and improve the synergistic efficiency of utility tunnel design, innovative design ideas and theoretical methods based on the concept of interactive design were proposed, and interactive design process and collaborative management system of utility tunnel were systematically discussed. In addition, a design and collaboration platform combined with BIM technology was established, and a new model of smart city construction was explored. The method was applied in a practical project. The use of BIM technology in the design of utility tunnel project could parallel the design work in advance, effectively integrate the pipeline network information, and avoid “errors, omissions, collisions, and deficiencies” caused by information fragmentation between majors. In addition, the method was able to analyze design parameters and operation and maintenance management collaboratively, realize program optimization under visual conditions, and significantly improve its design accuracy, program rationality and coordination consistency.
Last Update:
2021-06-17