LONG Cheng-li,LI Lu,CHEN Yan-bo,et al.Application of BIM Technology in the Design of Wuhan Nanhu Initial Rainwater Treatment Plant[J].China Water & Wastewater,2021,37(18 18):82-87.
Application of BIM Technology in the Design of Wuhan Nanhu Initial Rainwater Treatment Plant
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第37卷
Number:
18 18
Page:
82-87
Column:
Date of publication:
2021-09-17
- Keywords:
- BIM; initial rainwater treatment plant; deep foundation pits; superimposed structure; green building analysis
- Abstract:
- Wuhan Nanhu initial rainwater treatment plant is the core sub-project of the South Lake water environment improvement project. The initial rainwater treatment plant is arranged next to the lake and adopts a superimposed structure semi-buried form. The project is facing several design difficulties, such as large and deep foundation pits adjacent to the lake, complex process conditions and green building analysis requirement. In the design process, building information modeling (BIM) technology was employed to assist the modeling design, and project design quality, collaborative communication and design cycle were improved through the application of BIM. Relevant key points and application process of BIM technology in the design process were summarized, which provides experience for BIM design of initial rainwater treatment plant.