- Abstract:
- The total scale of a municipal wastewater treatment plant in Zhejiang Province is 8.0 ×104 m3/d, which is divided into three phases, of which the first and the second phases are 4.0×104 m3/d. The main process is modified SBR process, and the effluent quality was required to meet the first level B criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002). However, the discharge standard is required to upgrade to the local standard of Zhejiang Province Discharge Standard of Major Water Pollutants for Municipal Wastewater Treatment Plant (DB 33/2169-2018). Owing to the limited footprint and short construction term, the combined process of A/A/O, MBBR and DBDF was finally adopted in the upgrading project. The wastewater treatment plant runs stably after the reconstruction, and all indexes in the effluent reach the design standards.
Last Update:
2021-10-17