YINGJi-guang,LIN Li-feng,WANG Li-hua.Design and Commissioning of CEMS for Bailonggang Phase Ⅱ Sludge Project[J].China Water & Wastewater,2022,38(6):117-122.
Design and Commissioning of CEMS for Bailonggang Phase Ⅱ Sludge Project
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第38卷
Number:
第6期
Page:
117-122
Column:
Date of publication:
2022-03-17
- Keywords:
- sludge incineration; CEMS; measuring principle; feedback control
- Abstract:
- Sludge incineration has gradually become the mainstream route of municipal sludge treatment and disposal, reasonable design and application of continuous emission monitoring system (CEMS) is one of the keys to the success of the project. Shanghai Bailonggang phase Ⅱ sludge project uses sludge drying and incineration process and CEMS to monitor the emission indexes after incineration. In order to monitor the emission steadily and accurately, the design of CEMS, the selection of instrument installation position, the comparison and calibration of the system are studied and analyzed. At the same time, the CEMS data is feedback to the process control link of the incinerator to adjust and optimize the process operation condition.
Last Update:
2022-03-17