LUYi-cheng.Design and Operation of Changzhou Sludge Incineration Center Phase Ⅰ Project[J].China Water & Wastewater,2022,38(10):63-69.
Design and Operation of Changzhou Sludge Incineration Center Phase Ⅰ Project
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第38卷
Number:
第10期
Page:
63-69
Column:
Date of publication:
2022-05-17
- Keywords:
- sludge completely drying and incineration; mixing cylinder dryer; gyratory incinerator; paddle dryer
- Abstract:
- The design scale of Changzhou sludge incineration center phase Ⅰ project is 400 t/d, and there are three production lines. The core technology, namely mixing cylinder dryer, double-paddle dryer and gyratory incinerator, is imported from Japan to achieve stable incineration of completely dry sludge in the furnace. The flue gas is purified by the process of dry deacidification, bag dust removal and wet scrubbing. The odor treatment process is designed according to the principles of source classification control, classified collection and multi-method treatment, and good odor control performance is achieved. The project operates stably, and the whole system has excellent performance of flue gas heat recovery and pollutant control.
Last Update:
2022-05-17