XIAOXu-mu,CHENDe-ye,HUHe-ping,et al.Semi-closed Water Flowing Project Based on Joint Scheduling of Sluice & Pumping Station[J].China Water & Wastewater,2022,38(16):113-116.
Semi-closed Water Flowing Project Based on Joint Scheduling of Sluice & Pumping Station
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第38卷
Number:
第16期
Page:
113-116
Column:
Date of publication:
2022-08-17
- Abstract:
- Dongpo Lake is a semi-closed water with tidal influence. It has large water surface area, poor hydrodynamic condition and long-term retention time, which create favorable hydrological conditions for algae bloom and lead to eutrophication. In order to improve the hydrodynamic conditions of Dongpo Lake, water flowing engineering measures such as culvert reconstruction, setting pumping station and sluice were adopted. Through the joint scheduling of sluice & pumping station, the retention time of water was reduced from 22.3 days to 13.2 days. After the implementation of the water flowing project, the trophic level index (TLI) is 48-66 in a state of mesotropher to middle eutropher, showing a gradual decline. Since the current water flowing projects that have been implemented are not enough to completely solve the eutropher problem of Dongpo Lake, the other planning projects are urgently needed.
Last Update:
2022-08-17