ZHANGYan-jing.Real-time Forecast and Early Warning System for Integrated Scheduling of “WWTP, Pump Station, Sewer Network, and Initial Storm-water Storage Tank”[J].China Water & Wastewater,2022,38(24):108-114.
Real-time Forecast and Early Warning System for Integrated Scheduling of “WWTP, Pump Station, Sewer Network, and Initial Storm-water Storage Tank”
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第38卷
Number:
第24期
Page:
108-114
Column:
Date of publication:
2022-12-17
- Keywords:
- WWTP; pump station; sewer network and initial storm-water storage tank; integrated scheduling; real-time forecast and early warning
- Abstract:
- Under the background of smart water management system, in order to achieve the goal of intelligent operation of drainage facilities, the real-time forecast and early warning system for integrated scheduling of “WWTP, pump station, sewer network, and initial storm-water storage tank” has been developed. The system establishes an offline model through ICM, and uses ICM Live to configure an online model to develop a forecast and early warning system through software development scenarios. The system platform displays real-time online monitoring information such as rainfall, water level and flow of important pump stations, the sewage treatment plants, storage tanks and other drainage facilities. It can forecast and warn the water level of pump stations, incoming flow of WWTP and pipeline load in the form of curve or theme graphs 3 hours in advance. When the warning information appears, the simulation will be carried out according to the preset operation plan, and the simulation results can provide reference for operation scheduling.