GUXue-feng,WUPeng.Design and Construction of Emergency Plan for Compliance of New Effluent Criteria under Normal Operation[J].China Water & Wastewater,2023,39(6):103-107.
Design and Construction of Emergency Plan for Compliance of New Effluent Criteria under Normal Operation
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第39卷
Number:
第6期
Page:
103-107
Column:
Date of publication:
2023-03-17
- Keywords:
- wastewater treatment plant; emergency technical transformation; construction under normal operation
- Abstract:
- This paper investigates the causes of outlet incompliance of a wastewater treatment plant in Shanxi Province. Besides the large fluctuation of treated wastewater quantity, the inlet pollutants, such as COD, BOD5, SS, NH3-N, TN, TP etc. are much higher than what it designed, which results in its incompliance. Therefore, the emergency process design without water outage and expansion of land is carried out, and the actual treatment effect after transformation is analyzed, which has practical reference value for upgradibng and transformation of similar sewage treatment plants.
Last Update:
2023-03-17