NIENan.Optimization Design of Well Chamber for Auxiliary Facilities of Long Distance Water Transmission Pipeline[J].China Water & Wastewater,2023,39(10):95-98.
Optimization Design of Well Chamber for Auxiliary Facilities of Long Distance Water Transmission Pipeline
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第39卷
Number:
第10期
Page:
95-98
Column:
Date of publication:
2023-05-17
- Keywords:
- long distance water transmission pipeline; well chamber for auxiliary facilities; multifunctional well chamber
- Abstract:
- The well chamber for auxiliary facilities is the key component of long distance water transmission pipeline project, which affects the construction and safe operation of the whole project. In the design of a water transmission pipeline project, based on the design mode of invariable single function well chamber represented by the traditional standard atlas, the compact optimization design was realized through the scientific combination of multifunctional well chambers and the reasonable combination and arrangement of valves and pipe fittings. Finally, the optimization goal was achieved in the design of air valve chamber and multifunction servicing valve chamber, the total floor area was reduced by approximately 50%, and the goal of saving project investment was realized.
Last Update:
2023-05-17