WUDi,WANGYu-ting.Application of BIM Technology in Gushu Water Purification Plant Phase Ⅱ EPC Project in Shenzhen[J].China Water & Wastewater,2023,39(22):66-72.
Application of BIM Technology in Gushu Water Purification Plant Phase Ⅱ EPC Project in Shenzhen
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第39卷
Number:
第22期
Page:
66-72
Column:
Date of publication:
2023-11-17
- Abstract:
- The design scale of Gushu water purification plant phase Ⅱ project in Shenzhen is 32×104 m3/d. The project covers a footprint area of 15.14 hm2, and has the characteristics such as large quantities, many single treatment units and complex structure. In the design of the project, refined BIM design and quantitative simulation analysis were adopted to improve the design quality of the project and reduce late changes. In addition, a set of BIM-based project collaborative management platform was customized to centrally manage drawings, models, investment, quality, schedule, safety and equipment in the construction process. By elaborating on the key application of BIM in project design and construction, this paper summarized the BIM application process and methods, so as to provide experience for BIM design and EPC management of water purification plants.
Last Update:
2023-11-17