Operation Safety Control of Shanghai Lingqiao Waterworks in Upgrading and Reconstruction without Stopping Production
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第40卷
Number:
第10期
Page:
91-95
Column:
Date of publication:
2024-05-17
- Abstract:
- In order to improve effluent water quality and ensure safety of regional water supply, Lingqiao waterworks was upgraded and reconstructed for advanced treatment without stopping production. As operators, risk points were identified in reconstruction of high-voltage power distribution room, connections between new and old pipes, excavation and engineering commissioning. By taking measures and the process control, the waterworks was operated safely in quality and quantity, and the projects were finished as planned. According to 29 months of actual operation during construction, technical safety management experiences were summarized, which can provide reference for decision making of similar old waterworks upgrading and reconstruction projects.
Last Update:
2024-05-17