LIANGYu-wen,GUOYing-xin,ZHAOChen-chen,et al.Construction and Application of Integrated Assessment System of Urban Domestic Sewage Treatment Plant and Sewage Pipeline Network[J].China Water & Wastewater,2024,40(16):23-28.
Construction and Application of Integrated Assessment System of Urban Domestic Sewage Treatment Plant and Sewage Pipeline Network
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第40卷
Number:
第16期
Page:
23-28
Column:
Date of publication:
2024-08-17
- Keywords:
- sewage treatment plant and sewage pipeline network integration; associated with the inspection; pay according to the performance
- Abstract:
- The paper introduces an integrated assessment system for urban sewage treatment plant and sewage pipeline network based on the investigation and analysis of urban sewage treatment plant and sewage pipeline network operation and assessment condition in China, aiming to enhance the coordinated operation and management of sewage systems. Taking Y city as an example, an integrated assessment system for sewage treatment plant and sewage pipeline network was constructed, which combined the two-level linking assessment of district, along with the bidirectional associated assessment of the enterprise. The assessment indicators will encompass the influent quality, total amount of pollutants and sewage overflow, alongside the establishment of a linked payment model for sewage treatment plant operation and sewage pipeline network maintenance costs. The results indicate that the integrated assessment of sewage treatment plant and sewage pipeline network could effectively solve the problem of unascertainable punishment due to inconsistent responsibility main body of the sewage treatment plant and sewage pipeline network government supervision department, operation organization and payment department. Consequently, the assessment system could significantly enhance the motivation of sewage treatment plant and sewage pipeline network operation and maintenance, potentially leading to a reduction in sewage pipeline network operation and maintenance costs.
Last Update:
2024-08-17