XUXiaofeng,LIJianmin,YUHong,et al.Application of BIM Technology in Collaborative Design and Construction Management of Drainage Pumping Stations[J].China Water & Wastewater,2026,42(4):75-80.
Application of BIM Technology in Collaborative Design and Construction Management of Drainage Pumping Stations
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第42卷
Number:
第4期
Page:
75-80
Column:
Date of publication:
2026-02-17
- Keywords:
- BIM technology; drainage pumping station; 3D collaborative design; construction management
- Abstract:
- The Babao drainage pumping station is designed for a drainage flow rate of 200 m3/s, with an area of 27.53 hm2. The project features a large engineering volume, multiple involved disciplines, and a complex structural configuration. To overcome the risks of errors and omissions resulting from information silos in traditional serial design processes, Building Information Modeling (BIM) technology was adopted throughout the investigation, design, and construction management stages. In the design phase, based on the collaborative platform, intelligent group-pile design, rapid generation of special-shaped components, project quantity calculations linked with drawings, and drawing generation method based on model section views were introduced, and corresponding plugins were developed to enhance operational efficiency. During the construction phase, quality, schedule, and safety were effectively managed through visual technical briefings and the deployment of a BIM-based B/S-architecture construction management application. This project demonstrates that the BIM-enabled design and construction management approach can significantly improve design quality. It can also effectively control on-site progress and support quality management, as well as reduce construction costs and risks. The design can provide valuable experience for the construction of similar sluice-gate and pumping station projects.
Last Update:
2026-02-17