PANHailong,ZENGJun,SONGZiheng.Construction and Operation of a Large-scale Prefabricated Municipal Wastewater Treatment Plant in Xining[J].China Water & Wastewater,2026,42(4):120-125.
Construction and Operation of a Large-scale Prefabricated Municipal Wastewater Treatment Plant in Xining
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第42卷
Number:
第4期
Page:
120-125
Column:
Date of publication:
2026-02-17
- Keywords:
- prefabricated municipal wastewater treatment plant; A2O-A process; construction period; land occupation; treatment cost
- Abstract:
- To address the insufficient wastewater treatment capacity in Xining, a new municipal wastewater treatment plant with a capacity of 100 000 m3/d has been constructed. This plant employs an advanced treatment process of pre-treatment + A2O-A + MBR + disinfection. It achieved commissioning in just 88 days, occupying only 2.93 hm2 of land. The effluent quality meets the first level A standard specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002), with treatment cost of 1.16 CNY/m3. This paper provides a detailed analysis of its prefabricated construction methodology, wastewater treatment process, and cost, aiming to offer new insights for the construction and operation of large?scale prefabricated wastewater treatment plants.