LIUYong-hong,HUANGSheng-shang.Key Points for Compiling the Guidelines for Eliminating Blank Areas in Sewage Collection Pipe Networks in Fujian Province[J].China Water & Wastewater,2024,40(22):1-6.
Key Points for Compiling the Guidelines for Eliminating Blank Areas in Sewage Collection Pipe Networks in Fujian Province
China Water & Wastewater[ISSN:1000-4062/CN:12-1073/TU]
volume:
第40卷
Number:
第22期
Page:
1-6
Column:
Date of publication:
2024-11-17
- Keywords:
- sewage; collection pipe networks; blank areas; governance plan; technical point; improvement of quality and efficiency
- Abstract:
- To promote the action of eliminating blank areas in sewage collection pipe networks and accurately grasp the core work and key technical issues of eliminating blank areas, the Department of Housing and Urban-Rural Development of Fujian Province has organized the compilation of the Guidelines for Basic Elimination of Blank Areas in Sewage Collection Pipe Networks in Township Built-up in Fujian Province. Through exploring the work process of eliminating blank areas, the document proposes technical points regarding the definition and classification of blank areas, blank areas investigation and definition methods, the selection and combination of governance measures, and the requirements for the preparation of the governance plan for eliminating blank areas in sewage collection pipe networks. It is emphasized that the eliminating blank areas in sewage collection pipe networks should focus on classified measures, developing practical plans, and continuously promoting construction. This approach will ensure that tangible achievement results in governance and provide a foundation for the improvement of sewage treatment quality and efficiency, enhancing the capacity and level of urban domestic sewage facilities.
Last Update:
2024-11-17