[1]吴伟,周晨,吴昊,等.淮河流域取水工程设计优化分析[J].中国给水排水,2022,38(4):82-87.
 WUWei,ZHOUChen,WUHao,et al.Design Optimization of a Water Intake Project in Huaihe River Basin[J].China Water & Wastewater,2022,38(4):82-87.
点击复制

淮河流域取水工程设计优化分析

相似文献/References:

[1]周蓉,王绍贵,闫新秀.韶关市第三污水处理厂进厂干管穿越北江段设计优化[J].中国给水排水,2022,38(8):121.
 ZHOURong,WANGShao-gui,YANXin-xiu.Design Optimization of Shaoguan No. 3 Wastewater Treatment Plant Incoming Trunk Main Crossing Beijiang River Section[J].China Water & Wastewater,2022,38(4):121.
[2]邓章铁,杨圣虎,吏细歌,等.超深长距离顶管对接施工关键技术研究与应用[J].中国给水排水,2023,39(2):125.
 DENGZhang-tie,YANGSheng-hu,LIXi-ge,et al.Research and Application of Key Technology for Super Deep and Long Distance Pipe Jacking Butt Joint Construction[J].China Water & Wastewater,2023,39(4):125.
[3]王植林,罗宏伟,汪勇.浅滩型湖床长距离取水工程设计与施工关键技术[J].中国给水排水,2023,39(12):68.
 WANGZhi-lin,LUOHong-wei,WANGYong.Design and Key Construction Technology of Long-distance Water Intake Project in Shallow Lake Bed[J].China Water & Wastewater,2023,39(4):68.
[4]郑平,崔旭辉,卢海军.超长距离顶管管道上浮控制实施时机的研究[J].中国给水排水,2023,39(20):120.
 ZHENGPing,CUIXu-hui,LUHai-jun.Research on the Implementation Timing of Pipe Floating Control for Ultra?long Distance Pipe Jacking[J].China Water & Wastewater,2023,39(4):120.

更新日期/Last Update: 2022-02-17