LIUJin-xing,HUBang,CHENGMing-tao.Process Design of Wastewater Treatment Plant under Land Constraint[J].China Water & Wastewater,2024,40(22):58-62.
紧凑用地的污水处理厂工艺设计
- Title:
- Process Design of Wastewater Treatment Plant under Land Constraint
- 摘要:
- 江苏省某污水处理厂四期扩建工程总设计规模为5.0×104 m3/d,生化处理采用“Bardenpho生化池+二沉池”工艺,深度处理采用“反硝化滤池+高效沉淀池+紫外线消毒”工艺,设计出水水质执行《太湖地区城镇污水处理厂及重点工业行业主要水污染物排放限值》(DB 32/1072—2018)中表2的标准,其中COD≤41 mg/L。该工程将生化池、二沉池、污泥泵房、二级提升泵房合建,将反硝化滤池、反洗风机房、反洗废水池合建,并在高效沉淀池中投加微砂,提高处理负荷,大大减少了污水厂占地面积,解决了污水厂用地紧张的问题。
- Abstract:
- The total design capacity of the phase Ⅳ expansion project in a wastewater treatment plant in Jiangsu Province is 5.0×104 m3/d. The secondary biochemical treatment system consists of Bardenpho biochemical tank and secondary settling tank, while the advanced treatment utilizes a combination of denitrification filter, high-efficiency settling tank and ultraviolet disinfection. The design effluent quality is required to meet the limit in table 2 specified in Discharge Standard of Main Water Pollutants for Municipal Wastewater Treatment Plant & Key Industries of Taihu Area (DB 32/1072-2018), where COD shall not exceed 41 mg/L. In this project, the biochemical tank, secondary settling tank, sludge pumping house, and secondary pumping house were constructed as a unified facility, the denitrification filter, backwashing blower chamber, and backwashing wastewater tank were integrated into a single system, and micro-sand was introduced into the high-efficiency settling tank. These designs enhanced the treatment capacity while significantly reducing the footprint area of the wastewater treatment plant and addressing the land constraint issue.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(22):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(22):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(22):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(22):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(22):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(22):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(22):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(22):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(22):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(22):81.