GAOWei-nan,TIANMeng,LIWei,et al.Discussion on Design of Wastewater Treatment Plant with High Concentration Wastewater in a Long?term Low Temperature Region[J].China Water & Wastewater,2025,41(4):62-68.
长期低温高水质浓度污水处理厂设计探讨
- Title:
- Discussion on Design of Wastewater Treatment Plant with High Concentration Wastewater in a Long?term Low Temperature Region
- Keywords:
- wastewater treatment plant; severe cold region; multi-stage A2/O; ultrafiltration membrane; denitrifying deep bed filter; hydrolytic acidification; BioWin software
- 摘要:
- 为缓解区域污水处理压力,某高寒地区新建一座污水处理厂,设计规模2.0×104 m3/d,设计出水水质执行《城镇污水处理厂污染物排放标准》(GB 18918—2002)一级A标准。该污水处理厂面临长期低温、进水浓度高、出水回用稳定性要求高等难题,采用水解酸化+多段A2/O生物池+二沉池+混凝沉淀+反硝化深床滤池+超滤膜的工艺路线,实现了污水的达标处理和稳定回用;通过为水解酸化单元及超滤膜单元设置超越条件,提高污水处理厂的运营灵活性,降低了运行费用。结果表明,经过该组合工艺处理后,各出水指标稳定达标,在冬季依然具有良好的运行效果,且超滤膜多数时间处于超越工况。该工程概算总投资约27 493.20万元,处理成本为5.28元/m3,该工艺路线及措施可为类似工程设计提供参考。
- Abstract:
- To alleviate the pressure of regional wastewater treatment, a new wastewater treatment plant with a design capacity of 2.0×104 m3/d was built in a severe cold region, and the effluent quality need to meet the first level A limit specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002). Confronted with the challenges of long-term low temperatures, elevated influent concentrations, and stringent effluent stability requirements for reuse, the wastewater treatment plant implemented a process comprising hydrolytic acidification, multi-stage A2/O bioreactor, secondary sedimentation tank, coagulation-sedimentation tank, denitrifying deep bed filter, and ultrafiltration to meet the discharge standard and achieve consistent reuse of wastewater. By establishing crossover conditions for the hydrolytic acidification unit and the ultrafiltration unit, the operational flexibility of the wastewater treatment plant was enhanced, leading to a reduction in operating costs. After the combined process treatment, each effluent parameter consistently met the discharge standard. The operational performance remained effective even in winter, and the ultrafiltration remained inactive for the majority of the time. The total estimated investment for the project is approximately 274.932 million yuan, with a unit wastewater treatment cost of 5.28 yuan/m3. The process route and measures outlined can serve as a reference for similar engineering design.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(4):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(4):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(4):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(4):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(4):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(4):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(4):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(4):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(4):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(4):81.