[1]卢如,巨志剑,杜琼.采用A/O工艺的污水处理厂提标改造工程设计[J].中国给水排水,2018,34(20):56-59.
 LU Ru,JU Zhi jian,DU Qiong.Upgrading and Reconstruction Project Design of Wastewater Treatment Plant with A/O Process[J].China Water & Wastewater,2018,34(20):56-59.
点击复制

采用A/O工艺的污水处理厂提标改造工程设计

参考文献/References:

[1]周雹. 活性污泥工艺简明原理及设计计算[M]. 北京:中国建筑工业出版社,2005.Zhou Bao. Simple Principle and Design Calculation of Activated Sludge Process[M]. Beijing:China Architecture & Building Press,2005(in Chinese).
[2]周丹,周雹. 污水脱氮工艺中外部碳源投加量简易计算方法[J]. 给水排水,2011,37(11):38-41.Zhou Dan,Zhou Bao. Simple calculation method for the outside carbon source dosage for nitrogen removal process in wastewater treatment[J]. Water & Wastewater Engineering,2011,37(11):38-41(in Chinese).
[3]孙淑琴,常华,李建科,等. 水厂改造工程设计与运行案例分析[J]. 净水技术,2013,32(4):90-95.Sun Shuqin,Chang Hua,Li Jianke,et al. Case analysis of design and operation for rehabilitation project of water treatment plant[J]. Water Purification Technology,2013,32(4):90-95(in Chinese).

相似文献/References:

[1]张莹,王昌稳,李军,等.投加微粉强化低浓度生活污水活性污泥好氧颗粒化[J].中国给水排水,2018,34(21):12.
 ZHANG Ying,WANG Chang wen,LI Jun,et al.Strengthening Aerobic Granulation of Activated Sludge by Adding Micro Powder in Low Concentration Sewage Treatment[J].China Water & Wastewater,2018,34(20):12.
[2]熊建英.MBBR+磁混凝工艺用于污水处理厂提标改造[J].中国给水排水,2018,34(20):50.
 XIONG Jian ying.Application of MBBR + Magnetic Coagulation Process for Upgrading of Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(20):50.
[3]王连杰,李金河,郑兴灿,等.城镇污水系统中病毒特性和规律相关研究分析[J].中国给水排水,2020,36(6):14.
[4]周亚梁,黄东月.南方某污水处理厂提标改造工艺运行优化[J].中国给水排水,2020,36(8):113.
[5]顾玉中,黄学军,金秋景,等.污水处理厂轴流泵电流爬升的原因及解决方法[J].中国给水排水,2020,36(10):119.
[6]王凯,高波,张磊,等.危废处置中心污水分质处理工艺设计及运行经验[J].中国给水排水,2020,36(16):69.
 WANG Kai,GAO Bo,ZHANG Lei,et al.Experience in Design and Operation of Wastewater Separate Treatment in the Hazardous Waste Disposal Center[J].China Water & Wastewater,2020,36(20):69.
[7]李爽,王向阳,郝晓地,等.全生命周期评价在污水处理中的研究与应用[J].中国给水排水,2020,36(18):32.
 LI Shuang,WANG Xiang-yang,HAO Xiao-di,et al.Research and Application of Life Cycle Assessment in Wastewater Treatment[J].China Water & Wastewater,2020,36(20):32.
[8]许晓明,刘宇心,闫萍,等.以工业废水为主的污水厂准Ⅳ类水质提标扩建工程设计[J].中国给水排水,2020,36(18):60.
 XU Xiao-ming,LIU Yu xin,YAN Ping,et al.A Design Case of Upgrading and Expansion Project to Meet the Quasi-Ⅳ Class Standard in a WWTP with Industrial Wastewater as Its Major Influent[J].China Water & Wastewater,2020,36(20):60.
[9]聂健锋,曾超.三峡库区Carrousel氧化沟工艺提标升级改造设计[J].中国给水排水,2020,36(18):66.
 NIE Jian-feng,ZENG Chao.Design of Upgrading and Reconstruction of Carrousel Oxidation Ditch Process in Three Gorges Reservoir Area[J].China Water & Wastewater,2020,36(20):66.
[10]张莉,余国富,瞿露,等.重庆市某污水处理厂一级A提标改造运行效果分析[J].中国给水排水,2020,36(18):95.
 ZHANG Li,YU Guo-fu,QU Lu,et al.Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing[J].China Water & Wastewater,2020,36(20):95.
[11]张岳,葛铜岗,孙永利,等.基于城镇污水处理全流程环节的碳排放模型研究[J].中国给水排水,2021,37(9):65.
 ZHANG Yue,GE Tong-gang,SUN Yong-li,et al.Research on Carbon Emission Model Based on the Whole Process of Urban Sewage Treatment[J].China Water & Wastewater,2021,37(20):65.

备注/Memo

作者简介:卢如(1987-),女,江西丰城人,硕士,工程师,主要从事市政给排水处理研究。
E-mail:303632669@qq.com
收稿日期:2018-04-18

更新日期/Last Update: 2018-10-17