LI Hong-bin,LIU Bao-cheng,LI Chang-bing,et al.Commissioning and Operation of Five-stage Bardenpho Process in a Municipal Sewage Treatment Plant in Hangzhou[J].China Water & Wastewater,2020,36(12):150-154.
杭州某城镇污水处理厂五段式Bardenpho工艺调试运行
- Title:
- Commissioning and Operation of Five-stage Bardenpho Process in a Municipal Sewage Treatment Plant in Hangzhou
- 关键词:
- 五段式Bardenpho; 脱氮除磷; 调试运行
- Keywords:
- font-size: 10pt; ">five- font-size: 10pt; ">stage Bardenpho; nitrogen and phosphorus removal; commissioning and operation
- 摘要:
-
对杭州某城镇污水处理厂五段式Bardenpho工艺的调试过程进行总结,分析了运行过程中遇到的原水中碳源的充分利用、生物除磷效果的控制等问题。采取初沉池超越运行、严格控制好氧段溶解氧和内回流比等措施,实现了在生物池完成脱氮除磷并节省碳源投加量的效果。实践证明,五段式Bardenpho工艺的出水水质可满足《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A标准。
- Abstract:
-
The commissioning process of five- stage Bardenpho in a wastewater treatment plant of Hangzhou was summarized. The full utilization of carbon source in raw water and the control of biological phosphorus removal were analyzed. By means of the bypass operation of primary sedimentation tank and the strict control of dissolved oxygen and internal reflux ratio in the aerobic section, nitrogen and phosphorus were removed in the biological tank as well as the carbon source is saved. The effluent quality of five-stage Bardenpho can meet the first level A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB 18918-2002).
相似文献/References:
[1]董姗燕,陈刚,池春榕,等.厌氧环境对UNITANK工艺性能的影响[J].中国给水排水,2018,34(21):74.
DONG Shan yan,CHEN Gang,CHI Chun rong,et al.Effect of Anaerobic Environment on Performance of UNITANK Process[J].China Water & Wastewater,2018,34(12):74.
[2]李磊,王社平.低温条件下微孔曝气氧化沟中试装置的调试及启动[J].中国给水排水,2020,36(7):7.
[3]周亚梁,黄东月.南方某污水处理厂提标改造工艺运行优化[J].中国给水排水,2020,36(8):113.
[4]肖炘圻,陈鑫,周伟,等.喀斯特地区乡镇污水一体化处理技术效果分析[J].中国给水排水,2020,36(9):12.
[5]陈江杰,贺雷蕾,刘锐,等.A2O设施处理长三角平原地区农村生活污水的效果[J].中国给水排水,2020,36(9):75.
[6]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(12):111.
[7]聂健锋,曾超.三峡库区Carrousel氧化沟工艺提标升级改造设计[J].中国给水排水,2020,36(18):66.
NIE Jian-feng,ZENG Chao.Design of Upgrading and Reconstruction of Carrousel Oxidation Ditch Process in Three Gorges Reservoir Area[J].China Water & Wastewater,2020,36(12):66.
[8]柴晓利,韩红波,张宏亮,等.HPB工艺用于污水厂提标扩容改造的生产性试验研究[J].中国给水排水,2021,37(1):9.
CHAI Xiao-li,HAN Hong-bo,ZHANG Hong-liang,et al.Full-scale Test of HPB Process Applied in Upgrading and Capacity Expansion of a Wastewater Treatment Plant[J].China Water & Wastewater,2021,37(12):9.
[9]夏雯菁.大型机场污水处理改造工程实例[J].中国给水排水,2021,37(4):110.
XIA Wen-jing.Example of a Wastewater Treatment Reconstruction Project in a Large Airport[J].China Water & Wastewater,2021,37(12):110.
[10]茹春,张爽,路晖,等.低温条件下污水处理厂的除污效果及运行调控分析[J].中国给水排水,2021,37(9):1.
RU Chun,ZHANG Shuang,LU Hui,et al.Pollutants Removal Performance and Operation Regulation of Urban Wastewater Treatment Plant under Low Temperature Condition[J].China Water & Wastewater,2021,37(12):1.