[1]郭红峰,张丽丽,姚旭峰,等.七格三期污水处理厂转鼓式细格栅的改造与运行[J].中国给水排水,2020,36(16):132-136.
 GUO Hong-feng,ZHANG Li-li,YAO Xu-feng,et al.Reconstruction and Operation of Drum Type Fine Screen in Qige Phase ⅢWastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):132-136.
点击复制

七格三期污水处理厂转鼓式细格栅的改造与运行

相似文献/References:

[1]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
 ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):101.
[2]孙茵,彭世瑾,王莉芸,等.基于问题导向和环境提升的老旧小区海绵化改造[J].中国给水排水,2021,37(8):125.
 SUN Yin,PENG Shi-jin,WANG Li-yun,et al.Sponge City Renovation for an Old Residential Quarter Based on Problem Orientation and Landscape Environment Improvement[J].China Water & Wastewater,2021,37(16):125.

更新日期/Last Update: 2020-08-17