[1]陈杨,马保松,曾聪.顶管施工的地表沉降数值分析和顶力计算[J].中国给水排水,2020,36(20):27-31.
 CHEN Yang,MA Bao-song,ZENG Cong.Numerical Analysis of Surface Settlement and Calculation of Jacking Force for Pipejacking Construction[J].China Water & Wastewater,2020,36(20):27-31.
点击复制

顶管施工的地表沉降数值分析和顶力计算

相似文献/References:

[1]贾凯,武永新,徐振博.美兰机场排水工程的多孔小间距顶管施工关键技术[J].中国给水排水,2021,37(22):113.
 JIA Kai,WU Yong-xin,XU Zhen-bo.Key Technology of Multi-hole and Small-spacing Pipe Jacking Construction in Meilan Airport Drainage Project[J].China Water & Wastewater,2021,37(20):113.

更新日期/Last Update: 2020-10-17