Lü Wen-lin,SUN De-shou,WANG Wei-wei,et al.Application of Rotating Biological Contactors in Reconstruction and Expansion Project of a Municipal Wastewater Treatment Plant[J].China Water & Wastewater,2021,37(4):82-86.
生物转盘在某城镇污水处理厂改造扩容工程中的应用
- Title:
- Application of Rotating Biological Contactors in Reconstruction and Expansion Project of a Municipal Wastewater Treatment Plant
- 摘要:
- 平凉市某污水处理厂原设计规模5.0×104 m3/d,采用传统A2/O+深度处理工艺,本次扩建后规模达到8.5×104 m3/d。针对厂区用地紧张、进水总氮浓度高等问题,缺氧区采用生物转盘强化系统的脱氮性能,好氧区改造为限氧曝气区,并新建初沉池以确保出水指标达标。实际运行数据显示,在低温、低碳氮比条件下,出水水质可稳定达到《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A标准。该工程总投资为10 793.17万元,直接运行成本为0.72元/m3。
- Abstract:
- The original design capacity of a wastewater treatment plant in Pingliang City is 5.0×104 m3/d, using the traditional A2O+advanced treatment process, the capacity of this expansion reaches 8.5×104 m3/d. In view of the shortage of land and high concentration of influent total nitrogen, the anoxic zone adopts rotating biological contactors to enhance the denitrification performance, the aerobic zone is transformed into limited aeration zone, and a new primary sedimentation tank is built to ensure the design effluent target. Actual operation results showed that effluent quality stably met the first level A criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002) under low temperature and low C/N ratio. The total investment of the project was 107.931 7 million yuan, and the direct operation cost was 0.72 yuan/m3.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(4):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(4):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(4):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(4):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(4):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(4):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(4):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(4):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(4):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(4):81.