ZHOU Chuan-ting,TANG Jian-guo,WANG Yin.Design and Operation of Sewage Treatment Plant with Improved A2/O+MBBR Process[J].China Water & Wastewater,2021,37(6):76-80.
改良A2/O+MBBR为主体的污水厂工艺设计及运行
- Title:
- Design and Operation of Sewage Treatment Plant with Improved A2/O+MBBR Process
- 关键词:
- 污水处理厂; 改良A2O+MBBR工艺; 工艺特点
- 摘要:
- 新江水质净化二厂设计规模为7.5×104 m3/d,出水水质执行《城镇污水处理厂污染物排放标准》(GB 18918—2002)中的一级A标准。进水中工业废水量约占70%,进水水质波动大,超标风险高,具有难降解COD及TP、TN浓度高等水质特征。设计采用事故调节池+水解酸化池+改良A2O+MBBR+磁混凝高效沉淀池+反硝化深床滤池处理工艺。在确定主体工艺方案的基础上,建立了多水质工况运行模式,并利用BioWin软件分析优化设计参数。实际运行结果表明,污水厂运行稳定,出水水质优于设计出水标准。
- Abstract:
- Xinjiang second wastewater treatment plant had a design capacity of 75 000 m3/d. The index of outflow was carried out by first class A standard of Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002). Industrial wastewater accounts for about 70% of the influent. The influent quality fluctuates greatly and the risk of exceeding the standard is high. It has the characteristics of high concentration of refractory COD, TP and TN. In the engineering design, the treatment processes include accident regulating tank+hydrolysis acidification tank+improved A2O+MBBR+magnetic coagulation high-efficiency sedimentation tank+denitrification deep bed filter. On the basis of determining the main process scheme, multiple operation modes were established for different water quality conditions, and the design parameters were optimized through the software BioWin. Actual operation data showed that the operation of the wastewater treatment plant was stable, and the effluent quality was superior to the designed effluent standard.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(6):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(6):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(6):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(6):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(6):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(6):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(6):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(6):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(6):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(6):81.