FENG Hong-li,ZHAO Meng-yue,DING Shu-zhe.Optimal Control of Biological Nitrogen Removal in A2/O Process of WWTP[J].China Water & Wastewater,2021,37(6):102-106.
城市污水厂A2/O工艺生物脱氮过程优化控制
- Title:
- Optimal Control of Biological Nitrogen Removal in A2/O Process of WWTP
- Keywords:
- A2/O process; biological nitrogen removal; aeration rate; internal reflux ratio; carbon source; optimal control
- 摘要:
- 针对城市污水厂运行过程中曝气风机能耗高、外加碳源药耗高的问题,将A2/O工艺中好氧池沿程氨氮浓度、进出水总氮浓度、缺氧池末端出水的硝酸盐氮浓度和COD浓度作为分析对象,进行A2/O生物脱氮过程的优化控制。首先根据好氧池沿程氨氮浓度调节好氧池的曝气量,从而进行硝化过程的优化控制。然后根据进、出水总氮浓度调节系统的内回流比,根据缺氧池末端出水的硝酸盐氮浓度和COD浓度调节缺氧池外部的碳源投加量,从而进行反硝化过程的优化控制。结果表明,采取上述生物脱氮过程的优化控制策略,使得某5×104 m3/d的城市污水处理厂在实际运行中曝气量降低了50%,碳源投加量降低了74%,出水水质仍能达到排放标准。
- Abstract:
- In view of the problems such as high aeration consumption and high consumption of external carbon source in the operation process of a municipal wastewater treatment plant (WWTP), the ammonia nitrogen concentration along the aerobic tank, the influent and effluent total nitrogen concentrations, nitrate nitrogen and COD concentrations at the end of the anoxic tank in the A2/O process were analyzed as the objects to optimize its biological nitrogen removal process. Firstly, the aeration rate of the aerobic tank was adjusted according to the ammonia nitrogen concentrations along the aerobic tank to optimize the nitrification process. Then the internal reflux ratio was adjusted according to influent and effluent total nitrogen concentrations, and the external carbon source dosage is adjusted according to the nitrate nitrogen and COD concentrations at the end of the anoxic tank. The results indicated that taking the optimal control strategy of biological nitrogen removal process mentioned above, the aeration rate of a 5×104 m3/d municipal WWTP was reduced by 50% during actual operation, and the external carbon source dosage was reduced by 74%, which can still reach the discharge standards.
相似文献/References:
[1]郭莉芳,朱宇峰,滕良方,等.MBBR用于南方某污水厂强化脱氮效果分析[J].中国给水排水,2020,36(7):101.
[2]蒋彬,薛岳.工业废水与生活污水合并处理工程的改造与应用[J].中国给水排水,2020,36(8):92.
[3]田敏,崔涛,吕恺,等.西安市第四污水处理厂A2/O工艺的脱氮性能评价[J].中国给水排水,2020,36(13):1.
TIAN Min,CUI Tao,LU Kai,et al. Denitrification Performance Evaluation of A2/O Process in Xi’an Fourth Wastewater Treatment Plant [J].China Water & Wastewater,2020,36(6):1.
[4]吴彦成,顾鑫,朱继涛,等.铁氨氧化污水生物脱氮技术的研究进展[J].中国给水排水,2020,36(18):38.
WU Yan-cheng,GU Xin,ZHU Ji-tao,et al.Research Advances of Biological Nitrogen Removal from Wastewater via Fe(Ⅲ) Reduction Coupled to Anaerobic Ammonium Oxidation (Feammox) Process[J].China Water & Wastewater,2020,36(6):38.
[5]黄子洪,向婷,方华,等.分步进水SBR工艺生物脱氮运行条件优化及数学模拟[J].中国给水排水,2020,36(23):89.
HUANG Zi-hong,XIANG Ting,FANG Hua,et al.Operational Condition Optimization and Mathematical Simulation of Biological Denitrification in Step-feed SBR Process[J].China Water & Wastewater,2020,36(6):89.
[6]王朝朝,张欢,闫立娜,等.高盐度冲击后厌氧氨氧化工艺恢复及运行特性[J].中国给水排水,2021,37(3):16.
WANG Zhao-zhao,ZHANG Huan,YAN Li-na,et al.Recovery and Operational Characteristics of Anammox Process after High Salinity Shock[J].China Water & Wastewater,2021,37(6):16.
[7]付昆明,傅思博,仇付国.不同生物脱氮路径下氧气、碳源等需求理论分析[J].中国给水排水,2021,37(10):8.
FU Kun-ming,FU Si-bo,QIU Fu-guo.Theoretical Analysis of Oxygen and Carbon Source Demand under Different Biological Nitrogen Removal Pathways[J].China Water & Wastewater,2021,37(6):8.
[8]王拓,严冰.多级A/O工艺协同精确控制系统用于低C/N进水污水厂[J].中国给水排水,2021,37(12):65.
WANG Tuo,YAN Bing.Application of Multi-stage A/O Process Collaborative Precise Control System in Wastewater Treatment Plant with Low C/N Influent[J].China Water & Wastewater,2021,37(6):65.
[9]周小琳,樊星,毕学军,等.两段式A/O-MBBR工艺生物脱氮中试与系统优化[J].中国给水排水,2021,37(19):72.
ZHOU Xiao-lin,FAN Xing,BI Xue-jun,et al.Pilot-scale Test and System Optimization of Two-stage A/O-MBBR Process for Biological Nitrogen Removal[J].China Water & Wastewater,2021,37(6):72.
[10]贺阳,袁玉亮,王进峰,等.超高浓度总氮废水生物脱氮工艺运行实例[J].中国给水排水,2021,37(20):116.
HE Yang,YUAN Yu-liang,WANG Jin-feng,et al.An Operation Case of Biological Denitrification Process for Ultra-high Total Nitrogen Wastewater[J].China Water & Wastewater,2021,37(6):116.