LU Gui-yong,LIU Li-xiang,XU Guang-ming,et al.Case Analysis of Noise Pollution Prevention in Urban Sewage Treatment Plant[J].China Water & Wastewater,2021,37(8):114-119.
城镇污水处理厂噪声污染防治案例分析
- Title:
- Case Analysis of Noise Pollution Prevention in Urban Sewage Treatment Plant
- Keywords:
- sewage treatment plant; NIMBY effect; noise pollution
- 摘要:
- 随着城市发展,部分城镇污水处理厂厂界距离居民区越来越近,导致环境敏感度提升并极易引发“邻避效应”。污水处理厂应积极实施环境整治,提高环境管控标准和能力。某污水厂通过梳理分析找出厂内噪声污染关键点源和厂外周边环境关键敏感点,通过点源和面源治理,采用防止或减轻噪声的产生、阻断噪声传播、受众隔音等方法,实施一点一策的治理方案。厂内点源噪声平均下降8 dB(A),厂外居民楼噪声平均下降5~6 dB(A),取得良好降噪效果,多年来未发生居民投诉事件,达到“与邻为善,长期共存”的目标。
- Abstract:
- With the development of cities, the boundary between some sewage treatment plants is getting closer to residential areas, leading to increased environmental sensitivity and NIMBY effects. Sewage treatment plants should actively implement environmental remediation to improve environmental control standards and capabilities. By sorting and analyzing the key point sources of noise pollution in the plant and the key sensitive points of the surrounding environment outside the plant, a sewage treatment plant adopts the methods of preventing or reducing noise generation, blocking noise transmission and sound insulation of the audience to implement the one-by-one treatment scheme. The noise of point source in the plant is reduced by 8 dB (A) on average, and the noise of residential buildings outside the plant is reduced by 5-6 dB (A) on average, achieving a good noise reduction effect. There has been no complaint events from residents for many years, achieving the goal of “being friendly to neighbors and coexisting for a long time”.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(8):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(8):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(8):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(8):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(8):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(8):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(8):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(8):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(8):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(8):81.