CHEN Liang,MO Shao-de,ZHOU Bo,et al.Application of Multi-stage AO+High Efficiency Sedimentation+Denitrification Filter Process in a WWTP with Quasi Class Ⅳ Effluent Standard[J].China Water & Wastewater,2021,37(10):75-78.
多段AO/高效沉淀/反硝化滤池用于准Ⅳ类标准污水厂
- Title:
- Application of Multi-stage AO+High Efficiency Sedimentation+Denitrification Filter Process in a WWTP with Quasi Class Ⅳ Effluent Standard
- 摘要:
- 广东某城镇污水处理厂首期工程规模为2.5×104 m3/d,出水水质执行地表水准Ⅳ类排放标准。生物处理段采用多段AO生化池,能够充分利用原水碳源,减少回流,节约能耗, 提高脱氮除磷效果。深度处理采用高效沉淀池+反硝化深床滤池工艺,以强化总氮、总磷和SS的去除。介绍了主要构筑物设计参数,分析了多段AO和反硝化深床滤池脱氮性能,总结了运行过程中存在的问题,并提出相应措施。实际运行数据表明,出水水质能够稳定达到准Ⅳ类标准。
- Abstract:
- The design scale of the first stage of a wastewater treatment plant in Guangdong was 2.5×104 m3/d. The effluent was required to meet the standard of surface water quasi class Ⅳ. To improve the removal efficiencies of nitrogen and phosphorous, multi-stage AO process was adopted as biochemical treatment technology, which could fully take advantage of the influent carbon source and save energy via reducing backflow. High efficiency sedimentation tank and denitrification filter were adopted to strengthen the removal efficiencies of TN, TP and SS in advanced treatment process. The design parameters of main structures were introduced. The denitrification performance of multi-stage AO and denitrification filter was analyzed. Corresponding measures were proposed to solve the existing problems during the operation process. The actual operating data showed that the effluent quality could stably reach the quasi class Ⅳ standard.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(10):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(10):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(10):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(10):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(10):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(10):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(10):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(10):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(10):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(10):81.