YAN Ting-wen,PI Jing-yao,LIU Shi-de.Design of Ozonation Process in Large Underground Sewage Treatment Plant[J].China Water & Wastewater,2021,37(10):89-94.
大型地下式污水处理厂中臭氧处理工艺的设计
- Title:
- Design of Ozonation Process in Large Underground Sewage Treatment Plant
- 摘要:
- 天津市某大型地下式污水处理厂采用臭氧工艺作为深度处理工艺,用于去除污水中的难降解COD。该工程设计规模为60×104 m3/d,出水水质达到天津地标A标准的要求。臭氧工艺系统主要包括液氧站、臭氧制备间、臭氧接触池、尾气破坏器间等。详细介绍了臭氧系统各处理单元的设计细节、设备排布以及管道路由等。设计要点包括:制备间靠近箱体外边缘布置;发生器室设计三面防爆墙,一面泄压墙;外循环冷却水回水至超滤出水渠道,可节省冷却水的用量;每组臭氧接触池分两个点投加臭氧,投加比例为1 ∶1。设计重点考虑了臭氧系统各建(构)筑物之间的整体关联性,以保证臭氧系统的出水水质。
- Abstract:
- A large underground sewage treatment plant in Tianjin adopted ozonation technology as an advanced treatment process to remove refractory COD in sewage. The design treatment capacity of the project was 60×104 m3/d, and the effluent water quality was required to meet the limitations of Tianjin local A discharge standard. Ozonation process system mainly consisted of liquid oxygen station, ozone preparation room, ozone contact tank, exhaust destruction room, etc. The present work mainly discussed the overall process design of the ozone system, and introduced the design details of each treatment unit, equipment arrangement and pipeline routing. The key points were as follows: the preparation room was arranged near the outer edge of the box; the generator room was designed with three explosion-proof walls and one pressure-relief wall; external circulation of cooling water flowed back to ultrafiltration outlet channel to save the consumption of cooling water; each group of ozone contact tank had two feeding points with dosage ratio of 1 ∶1, etc. The design focused on the overall relationship among various structures of the ozone system to ensure the effluent water quality of the ozone system.
相似文献/References:
[1]郝晓地,于文波,王向阳,等.地下式污水处理厂全生命周期综合效益评价[J].中国给水排水,2021,37(7):1.
HAO Xiao-di,YU Wen-bo,WANG Xiang-yang,et al.Life Cycle Comprehensive Efficiency Assessment on Underground Wastewater Treatment Plant[J].China Water & Wastewater,2021,37(10):1.
[2]陈秀成.地下式污水处理厂用地指标分析及节地设计方向[J].中国给水排水,2023,39(4):53.
CHENXiu-cheng.Analysis of Land Quota and Land Conservation Design Direction of Underground Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(10):53.
[3]董磊,张欣,杨一烽.《城镇地下式污水处理厂技术规程》要点简析[J].中国给水排水,2023,39(16):14.
DONGLei,ZHANGXin,YANGYi-feng.Synopsis of Key Points for Technical Specification for Urban Underground Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(10):14.
[4]仲崇军,代世宇,王曼,等.地下式污水处理厂“双降一增”设计案例[J].中国给水排水,2024,40(4):59.
ZHONGChong-jun,DAIShi-yu,WANGMan,et al.Double Reduction and One Increase” of Underground Sewage Treatment Plant: A Design Case[J].China Water & Wastewater,2024,40(10):59.
[5]杨涛,何帅,崔容,等.地下式污水处理厂的卫生防护距离及臭气污染控制[J].中国给水排水,2024,40(6):67.
YANGTao,HEShuai,CUIRong,et al.Health Protection Zone and Odor Pollution Control of the Underground Wastewater Treatment Plant[J].China Water & Wastewater,2024,40(10):67.
[6]魏海娟.大型地下式污水处理厂工艺设计与运行效果分析[J].中国给水排水,2024,40(8):60.
WEIHai-juan.Design of a Large Underground Wastewater Treatment Plant and Its Operation Performance Analysis[J].China Water & Wastewater,2024,40(10):60.