ZHANG Wan-li,CHEN Xiao-guang,CHENG Wen,et al.Design of an Industrial Wastewater Treatment Plant Quasi-Ⅳ Standard Upgrading and Reconstruction Project in Wuxi[J].China Water & Wastewater,2021,37(12):70-75.
无锡市某工业污水处理厂准Ⅳ类提标改造工程设计
- Title:
- Design of an Industrial Wastewater Treatment Plant Quasi-Ⅳ Standard Upgrading and Reconstruction Project in Wuxi
- 摘要:
- 无锡市某工业污水处理厂规模6.0×104 m3/d,考虑适当超前的原则,其提标改造工程设计出水水质执行准Ⅳ标准(TN除外)。但由于进水中工业废水含量较高且种类复杂,为确保稳定达标,在中试研究结论的基础上,采用了浅层气浮工艺强化预处理,增设曝气生物滤池+反硝化滤池+均相臭氧催化氧化工艺进行深度处理。工程投产后实际出水水质稳定达到了设计要求,同时可根据来水水质灵活调整运行参数,以减少运行成本。
- Abstract:
- Treatment capacity of an industrial wastewater treatment plant in Wuxi is 6.0×104 m3/d. Base on the principle of moderate advance, the designed effluent quality needs to meet surface water quasi-Ⅳ standard (except TN ) in the upgrading and reconstruction project. However, the influent is characterized by a high proportion of industrial wastewater and complex composition. In order to ensure that the effluent quality meeting the discharge standard, shallow air flotation was employed as the pretreatment process, and biological aerated filter (BAF), deep bed denitrification filter and homogeneous catalytic ozonation technology were constructed to be the advanced treatment process based on the results of pilot experiments. After application of the project, the actual effluent quality stably met the design requirements, and it was flexible for managers to modify operating parameters according to the influent quality to reduce the operational cost.
相似文献/References:
[1]熊建英.MBBR+磁混凝工艺用于污水处理厂提标改造[J].中国给水排水,2018,34(20):50.
XIONG Jian ying.Application of MBBR + Magnetic Coagulation Process for Upgrading of Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(12):50.
[2]卢如,巨志剑,杜琼.采用A/O工艺的污水处理厂提标改造工程设计[J].中国给水排水,2018,34(20):56.
LU Ru,JU Zhi jian,DU Qiong.Upgrading and Reconstruction Project Design of Wastewater Treatment Plant with A/O Process[J].China Water & Wastewater,2018,34(12):56.
[3]周亚梁,黄东月.南方某污水处理厂提标改造工艺运行优化[J].中国给水排水,2020,36(8):113.
[4]许晓明,刘宇心,闫萍,等.以工业废水为主的污水厂准Ⅳ类水质提标扩建工程设计[J].中国给水排水,2020,36(18):60.
XU Xiao-ming,LIU Yu xin,YAN Ping,et al.A Design Case of Upgrading and Expansion Project to Meet the Quasi-Ⅳ Class Standard in a WWTP with Industrial Wastewater as Its Major Influent[J].China Water & Wastewater,2020,36(12):60.
[5]聂健锋,曾超.三峡库区Carrousel氧化沟工艺提标升级改造设计[J].中国给水排水,2020,36(18):66.
NIE Jian-feng,ZENG Chao.Design of Upgrading and Reconstruction of Carrousel Oxidation Ditch Process in Three Gorges Reservoir Area[J].China Water & Wastewater,2020,36(12):66.
[6]张莉,余国富,瞿露,等.重庆市某污水处理厂一级A提标改造运行效果分析[J].中国给水排水,2020,36(18):95.
ZHANG Li,YU Guo-fu,QU Lu,et al.Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing[J].China Water & Wastewater,2020,36(12):95.
[7]马丽芳,陈菊香,孙锐.克拉玛依市某污水处理厂一级A提标改造工程实例[J].中国给水排水,2020,36(18):122.
MA Li-fang,CHEN Ju-xiang,SUN Rui.A WWTP Upgrading Reconstruction Project to Meet the First Level A Discharge Standard in Karamay[J].China Water & Wastewater,2020,36(12):122.
[8]孙高升,王东东,弋凡,等.淮河流域地表水类Ⅳ类标准污水深度处理工艺研究[J].中国给水排水,2020,36(19):16.
SUN Gao-sheng,WANG Dong-dong,YI Fan,et al.Advanced Wastewater Treatment Process with Effluent Quality Meeting Level Quasi Ⅳ Criteria of Surface Water in Huai River Basin[J].China Water & Wastewater,2020,36(12):16.
[9]李亮,邱宏俊.改良A2/O氧化沟强化生化处理技术用于污水厂提标改造[J].中国给水排水,2020,36(20):124.
LI Liang,QIU Hong-jun.Application of Improved A2/O Oxidation Ditch Enhanced Biochemical Treatment Process for Upgrading the Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(12):124.
[10]黄志心.城镇污水处理厂提标改造实践与思考[J].中国给水排水,2020,36(22):48.
HUANG Zhi-xin.Practice and Thinking of Upgrading and Reconstruction of Municipal Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(12):48.