ZHANG Wan-li,FENG Shi-xun,CHENG Ming-tao.Design of a Wastewater Treatment Plant Upgraded to Higher Discharge Standard in an Industrial Park in Taihu Area[J].China Water & Wastewater,2021,37(12):83-87.
太湖流域某工业园区污水厂高排放标准提标改造工程设计
- Title:
- Design of a Wastewater Treatment Plant Upgraded to Higher Discharge Standard in an Industrial Park in Taihu Area
- Keywords:
- wastewater treatment plant in an industrial park; upgrading and reconstruction; quasi-Ⅳ standard of surface water
- 摘要:
- 无锡某工业园区污水处理厂准Ⅳ类水提标改造工程设计规模为2.5×104 m3/d,污水处理厂进水以印染废水为主,其水质具有B/C值低、溶解性难降解COD高、色度较高、NH3-N和TN较低的特点,针对于此,提标改造工程采用将工业废水与生活污水分质预处理、将Carrousel氧化沟改为A/O工艺、深度处理采用臭氧催化氧化+超滤工艺等措施。改造后的工艺流程为调节池+两级水解酸化池+初沉池+A/O池+二沉池+高效沉淀池+滤布滤池+臭氧催化氧化系统+超滤,出水水质能稳定达到《地表水环境质量标准》(GB 3838—2002)准Ⅳ类水标准(COD≤30 mg/L、BOD5≤6 mg/L、SS≤5 mg/L、NH3-N≤1.5 mg/L、TN≤10 mg/L、TP≤0.3 mg/L、色度≤30倍)。工程总投资为9 952.23万元,总处理成本为3.37元/m3。
- Abstract:
- The treatment capacity of a wastewater treatment plant in an industrial park in Wuxi is 2.5×104 m3/d, in which the effluent water quality is required to meet quasi-Ⅳ standard of surface water. Influent of the wastewater treatment plant is mainly printing and dyeing wastewater, which has the characteristics of low B/C ratio, high dissolve and refractory COD, high chromaticity and low NH3-N and TN. In response to these problems, separate pretreatment of industrial wastewater and domestic wastewater, transformation of Carrousel oxidation ditch by A/O process and addition of ozone catalyzed oxidation and ultrafiltration in advanced treatment were carried out in the upgrading project. The process after upgrading and reconstruction was as follows: regulating pond, two stage hydrolysis acidification tanks, primary sedimentation tank, A/O tank, secondary sedimentation tank, high efficiency sedimentation tank, cloth media filter, catalytic ozonation system and ultrafiltration. The effluent water quality could reach quasi-Ⅳ limitations of Environmental Quality Standards for Surface Water (GB 3838-2002), namely COD≤30 mg/L, BOD5≤6 mg/L, SS≤5 mg/L, NH3-N≤1.5 mg/L, TN≤10 mg/L, TP≤0.3 mg/L and chroma≤30 times. The total investment of the project was 99.522 3 million yuan and the total treatment cost was 3.37 yuan/m3.
相似文献/References:
[1]熊建英.MBBR+磁混凝工艺用于污水处理厂提标改造[J].中国给水排水,2018,34(20):50.
XIONG Jian ying.Application of MBBR + Magnetic Coagulation Process for Upgrading of Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(12):50.
[2]卢如,巨志剑,杜琼.采用A/O工艺的污水处理厂提标改造工程设计[J].中国给水排水,2018,34(20):56.
LU Ru,JU Zhi jian,DU Qiong.Upgrading and Reconstruction Project Design of Wastewater Treatment Plant with A/O Process[J].China Water & Wastewater,2018,34(12):56.
[3]周亚梁,黄东月.南方某污水处理厂提标改造工艺运行优化[J].中国给水排水,2020,36(8):113.
[4]许晓明,刘宇心,闫萍,等.以工业废水为主的污水厂准Ⅳ类水质提标扩建工程设计[J].中国给水排水,2020,36(18):60.
XU Xiao-ming,LIU Yu xin,YAN Ping,et al.A Design Case of Upgrading and Expansion Project to Meet the Quasi-Ⅳ Class Standard in a WWTP with Industrial Wastewater as Its Major Influent[J].China Water & Wastewater,2020,36(12):60.
[5]聂健锋,曾超.三峡库区Carrousel氧化沟工艺提标升级改造设计[J].中国给水排水,2020,36(18):66.
NIE Jian-feng,ZENG Chao.Design of Upgrading and Reconstruction of Carrousel Oxidation Ditch Process in Three Gorges Reservoir Area[J].China Water & Wastewater,2020,36(12):66.
[6]张莉,余国富,瞿露,等.重庆市某污水处理厂一级A提标改造运行效果分析[J].中国给水排水,2020,36(18):95.
ZHANG Li,YU Guo-fu,QU Lu,et al.Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing[J].China Water & Wastewater,2020,36(12):95.
[7]马丽芳,陈菊香,孙锐.克拉玛依市某污水处理厂一级A提标改造工程实例[J].中国给水排水,2020,36(18):122.
MA Li-fang,CHEN Ju-xiang,SUN Rui.A WWTP Upgrading Reconstruction Project to Meet the First Level A Discharge Standard in Karamay[J].China Water & Wastewater,2020,36(12):122.
[8]孙高升,王东东,弋凡,等.淮河流域地表水类Ⅳ类标准污水深度处理工艺研究[J].中国给水排水,2020,36(19):16.
SUN Gao-sheng,WANG Dong-dong,YI Fan,et al.Advanced Wastewater Treatment Process with Effluent Quality Meeting Level Quasi Ⅳ Criteria of Surface Water in Huai River Basin[J].China Water & Wastewater,2020,36(12):16.
[9]李亮,邱宏俊.改良A2/O氧化沟强化生化处理技术用于污水厂提标改造[J].中国给水排水,2020,36(20):124.
LI Liang,QIU Hong-jun.Application of Improved A2/O Oxidation Ditch Enhanced Biochemical Treatment Process for Upgrading the Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(12):124.
[10]黄志心.城镇污水处理厂提标改造实践与思考[J].中国给水排水,2020,36(22):48.
HUANG Zhi-xin.Practice and Thinking of Upgrading and Reconstruction of Municipal Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(12):48.