ZHANG Dan-dan,NIU He-xin,YU Kai-chang,et al.Application of Submerged Ultrafiltration Membrane and Ozone Contact Oxidation Process in a WWTP Upgrading and Reconstruction Project[J].China Water & Wastewater,2021,37(16):119-123.
浸没式超滤+臭氧氧化用于某污水处理厂提标改造
- Title:
- Application of Submerged Ultrafiltration Membrane and Ozone Contact Oxidation Process in a WWTP Upgrading and Reconstruction Project
- Keywords:
- wastewater treatment plant; upgrading and reconstruction; IFAS; submerged ultrafiltration; ozone contact oxidation
- 摘要:
- 为配合伊通河水生态治理,对长春某污水处理厂进行提标改造,提标改造工程处理规模为68×104 m3/d。针对进水可生化性差、出水标准高、厂区可利用土地紧张以及尽量利用厂区原有构筑物和设备的实际情况,确定本次提标改造工程采用IFAS工艺(原生化池改造)+浸没式超滤+臭氧接触氧化的工艺路线,进一步去除污水中的COD、BOD5、SS、NH3-N、TP和色度。提标改造完成后出水水质达到北京市《城镇污水处理厂水污染物排放标准》(DB 11/890—2012)的B标准。介绍了处理工艺流程和各处理工艺的主要设计参数、设备配置和工程占地,并重点介绍了浸没式超滤系统的设计、运行方式、投资及处理成本等。
- Abstract:
- In order to cooperate with the ecological management of Yitong River, a wastewater treatment plant (WWTP) in Changchun was upgraded and reconstructed, and the treatment capacity of the upgrading project was 68×104 m3/d. In view of the characteristics such as poor biodegradability of influent, high standard of effluent, shortage of available land and maximum use of the original structures and equipments of the WWTP, the combined process of integrated fixedfilm activated sludge (IFAS) transformed from the original biochemical tank, the submerged ultrafiltration membrane process (SUF) and ozone contact oxidation was determined to further remove the COD, BOD5, SS, NH3-N, TP and chroma. After upgrading, the effluent reaches the level B criteria in Discharge Standard of Water Pollutants for Municipal Wastewater Treatment Plants (DB 11/890-2012). The process flow, main design parameters, equipment configuration and occupied area of each process were introduced. The design, operation mode, investment and treatment cost of the SUF were introduced emphatically.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(16):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(16):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(16):13.
[4]熊建英.MBBR+磁混凝工艺用于污水处理厂提标改造[J].中国给水排水,2018,34(20):50.
XIONG Jian ying.Application of MBBR + Magnetic Coagulation Process for Upgrading of Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(16):50.
[5]卢如,巨志剑,杜琼.采用A/O工艺的污水处理厂提标改造工程设计[J].中国给水排水,2018,34(20):56.
LU Ru,JU Zhi jian,DU Qiong.Upgrading and Reconstruction Project Design of Wastewater Treatment Plant with A/O Process[J].China Water & Wastewater,2018,34(16):56.
[6]周亚梁,黄东月.南方某污水处理厂提标改造工艺运行优化[J].中国给水排水,2020,36(8):113.
[7]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(16):23.
[8]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):64.
[9]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):101.
[10]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(16):111.
[11]张莉,余国富,瞿露,等.重庆市某污水处理厂一级A提标改造运行效果分析[J].中国给水排水,2020,36(18):95.
ZHANG Li,YU Guo-fu,QU Lu,et al.Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing[J].China Water & Wastewater,2020,36(16):95.
[12]马丽芳,陈菊香,孙锐.克拉玛依市某污水处理厂一级A提标改造工程实例[J].中国给水排水,2020,36(18):122.
MA Li-fang,CHEN Ju-xiang,SUN Rui.A WWTP Upgrading Reconstruction Project to Meet the First Level A Discharge Standard in Karamay[J].China Water & Wastewater,2020,36(16):122.
[13]孙高升,王东东,弋凡,等.淮河流域地表水类Ⅳ类标准污水深度处理工艺研究[J].中国给水排水,2020,36(19):16.
SUN Gao-sheng,WANG Dong-dong,YI Fan,et al.Advanced Wastewater Treatment Process with Effluent Quality Meeting Level Quasi Ⅳ Criteria of Surface Water in Huai River Basin[J].China Water & Wastewater,2020,36(16):16.
[14]黄志心.城镇污水处理厂提标改造实践与思考[J].中国给水排水,2020,36(22):48.
HUANG Zhi-xin.Practice and Thinking of Upgrading and Reconstruction of Municipal Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):48.
[15]白玉华,张欣宇,黄政鑫,等.AAOA-MBR强化脱氮工艺用于内江市某污水厂提标改造[J].中国给水排水,2020,36(24):87.
BAI Yu-hua,ZHANG Xin-yu,HUANG Zheng-xin,et al.AAOA-MBR Enhanced Denitrification Process for Upgrading and Reconstruction of a Wastewater Treatment Plant in Neijiang[J].China Water & Wastewater,2020,36(16):87.
[16]吴琼,郭庆辉,张宏伟,等.A2/O-MBBR工艺用于沈水湾污水处理厂提标改造[J].中国给水排水,2020,36(24):99.
WU Qiong,GUO Qing-hui,ZHANG Hong-wei,et al.Application of A2/O-MBBR Process in Upgrading and Reconstruction of Shenshuiwan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):99.
[17]陈红继,叶昌明,戴文权,等.两级上向流生物滤池模块化装备用于污水厂提标改造[J].中国给水排水,2021,37(12):132.
CHEN Hong-ji,YE Chang-ming,DAI Wen-quan,et al.Application of Two-stage Upflow Biofilter Modular Equipment in Upgrading of a WWTP[J].China Water & Wastewater,2021,37(16):132.
[18]张子潇,魏屹,顾鑫,等.BAF工艺在污水厂提标改造中的应用[J].中国给水排水,2021,37(14):124.
ZHANG Zi-xiao,WEI Yi,GU Xin,et al.Application of BAF Process in Upgrading and Reconstruction of a WWTP[J].China Water & Wastewater,2021,37(16):124.
[19]翁献明,朱爽,谢明化,等.温州市南片污水厂提标至浙江省清洁排放标准的探索[J].中国给水排水,2021,37(16):13.
WENG Xian-ming,ZHU Shuang,XIE Ming-hua,et al.Exploration for Wenzhou Nanpian Sewage Treatment Plant Upgrading to Clean Discharge Standard of Zhejiang Province[J].China Water & Wastewater,2021,37(16):13.
[20]郑伟波,单伊娜,胡如意,等.高效沉淀池+反硝化深床滤池用于污水厂提标改造[J].中国给水排水,2021,37(16):124.
ZHENG Wei-bo,SHAN Yi-na,HU Ru-yi,et al.Application of High Efficiency Sedimentation Tank and DDBF in Upgrading and Reconstruction of a WWTP[J].China Water & Wastewater,2021,37(16):124.