MIAOPan.Application of Denitrifying Biofilter and High Efficiency Sedimentation Tank in Upgrading of a WWTP[J].China Water & Wastewater,2022,38(6):113-116.
反硝化生物滤池+高效沉淀池用于污水厂改造
- Title:
- Application of Denitrifying Biofilter and High Efficiency Sedimentation Tank in Upgrading of a WWTP
- Keywords:
- WWTP; upgrading; light denitrification biofilter; micro-sand high efficiency sedimentation tank
- 摘要:
- 传统污水厂处理出水水质很难达到《地表水环境质量标准》(GB 3838—2002)的准Ⅳ类标准,通常需要进行升级改造才能实现。某污水处理厂新增深度处理采用轻质反硝化生物滤池+微砂高效沉淀池工艺,处理水量为40×104 m3/d,处理后的出水水质由《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A排放标准提高到地表水准Ⅳ类标准,运行成本为0.355 元/m3,建设轻质反硝化生物滤池和微砂高效沉淀池投资成本分别为274、143.5 元/m3。该工程投运后取得较好的处理效果,可供其他提标改造项目参考。
- Abstract:
- It is very difficult for the effluent of a traditional wastewater treatment plant to reach level quasi-Ⅳ in Environmental Quality Standards for Surface Water (GB 3838-2002), thus it usually needs to be upgraded. The advanced treatment process of a newly built WWTP with a treatment capacity of 40×104 m3 /d, adopts light denitrification biofilter and micro-sand high efficiency sedimentation tank. The effluent quality after treatment is improved from the first level A criteria in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002) to the level quasi-Ⅳ in GB 3838-2002. The operating cost is 0.355 yuan/m3. For this upgrading project, the investment costs of constructing light denitrification biofilter and micro?sand high efficiency sedimentation tank are 274 yuan/m3 and 143.5 yuan/m3 respectively. The excellent treatment performance has been achieved after operation, which could provide references for other upgrading projects.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(6):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(6):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(6):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(6):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(6):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(6):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(6):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(6):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(6):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(6):81.