LIUXiao-jun.Design of Double Membrane Reclaimed Water Project of Yantai Taoziwan Wastewater Treatment Plant[J].China Water & Wastewater,2022,38(10):79-82.
烟台市套子湾污水厂双膜法再生水工程设计
- Title:
- Design of Double Membrane Reclaimed Water Project of Yantai Taoziwan Wastewater Treatment Plant
- Keywords:
- reclaimed water; ultrafiltration; reverse osmosis
- 摘要:
- 为了缓解烟台市水资源紧缺的局面,满足万华工业园百万吨大乙烯建设及烟台发电厂等项目对再生水的需求,实现水资源的合理利用,开展了套子湾污水厂再生水回用工程建设。一期新建规模为5×104 m3/d,利用污水处理厂原有反渗透设施,一期工程建成后再生水总规模达到10×104 m3/d。再生水进水来源为套子湾污水厂出水,进水水质执行《城镇污水处理厂污染物排放标准》(GB 18918—2002)一级A标准。基于进水水质特点和出水使用要求,采用超滤+反渗透再生水回用处理工艺。建成后出水水质优于《城市污水再生利用 工业用水水质》(GB/T 19923—2005)各项指标要求,出水浊度平均值为0.3 NTU,TDS平均值为110 mg/L。
- Abstract:
- A reclaimed water reuse project in Taoziwan wastewater treatment plant was constructed to realize rational utilization of water resources. The project is expected to alleviate the shortage of water resources in Yantai and meet the demand of reclaimed water for one million tons of ethylene construction project in Wanhua industrial park, Yantai power plant and other projects. The new scale of the phase I project is 5×104 m3/d, and the total scale of the reclaimed water plant after completion of the phase I project will reach 10×104 m3/d by utilizing the original reverse osmosis facilities of the wastewater treatment plant. The water source of the reclaimed water plant is the effluent from Taoziwan wastewater treatment plant, and the influent water quality needs to meet the first level A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB 18918-2002). Based on the characteristics of the influent quality and the utilization requirements of the effluent, a combined process consisting of ultrafiltration and reverse osmosis was eventually determined. After completion of the project, the effluent quality is better than the requirements of The Reuse of Urban Recycling Water—Water Quality Standard for Industrial Uses (GB/T 19923-2005), and the average turbidity and TDS in the effluent are 0.3 NTU and 110 mg/L, respectively.
相似文献/References:
[1]王文怀,王怡,韦存智,等.水绵强化浮床净化再生水补给的景观水体效果[J].中国给水排水,2018,34(21):59.
WANG Wen huai,WANG Yi,WEI Cun zhi,et al.Effect of Enhanced Spirogyra Floating Bed on Purification of Landscape Water Supplied with Reclaimed Water[J].China Water & Wastewater,2018,34(10):59.
[2]王金龙.再生水厂UF-RO双膜工艺的设计探讨及优化改进[J].中国给水排水,2020,36(24):120.
WANG Jin-long.Discussion and Improvement on Design of UF and RO Process in a Water Reclamation Plant[J].China Water & Wastewater,2020,36(10):120.
[3]李智,王怡,王文怀.不同水源补给对景观水体水质及浮游动物的影响[J].中国给水排水,2021,37(5):91.
LI Zhi,WANG Yi,WANG Wen-huai.Effects of Different Water Sources Supply on Water Quality and Zooplankton in Landscape Waters[J].China Water & Wastewater,2021,37(10):91.
[4]胡爱兵,杨少平,任心欣.深圳市再生水工作回顾与展望[J].中国给水排水,2021,37(8):18.
HU Ai-bing,YANG Shao-ping,REN Xin-xin.Review and Prospect of the Related Works on Reclaimed Water in Shenzhen[J].China Water & Wastewater,2021,37(10):18.
[5]陈卓,郝姝然,高强,等.《再生水利用效益评价指南》标准解读[J].中国给水排水,2021,37(18):1.
CHEN Zhuo,HAO Shu-ran,GAO Qiang,et al.Interpretation of an Association Standard of Guideline for Benefit Evaluation of Reclaimed Water Use[J].China Water & Wastewater,2021,37(10):1.
[6]常新强,林涛,陈卫,等.PAC/PS预处理对水中镉的去除及UF膜污染控制[J].中国给水排水,2022,38(1):64.
CHANG Xin-qiang,LIN Tao,CHEN Wei,et al.PAC/PS Pretreatment Process for Removal of Cadmium from Water and Control of Ultrafiltration Membrane Fouling[J].China Water & Wastewater,2022,38(10):64.
[7]王志红,植许鋆,李炳萱,等.KMnO4强化混凝耦合超滤去除湖库水中共存铁锰藻[J].中国给水排水,2022,38(5):1.
WANGZhi-hong,ZHIXu-jun,LIBing-xuan,et al.Potassium Permanganate Pre-oxidation Enhanced Coagulation Coupled with Ultrafiltration to Remove Co-existed Iron, Manganese and Algae in Lakes and Reservoirs in South China[J].China Water & Wastewater,2022,38(10):1.
[8]李方旭,杨伊菡,周小红,等.污水中包膜病毒离心超滤浓缩方法研究[J].中国给水排水,2022,38(7):28.
LIFang-xu,YANGYi-han,ZHOUXiao-hong,et al.Concentration of Enveloped Viruses in Wastewater by Centrifugal Ultrafiltration Method[J].China Water & Wastewater,2022,38(10):28.
[9]卢彪,杨志峰,马延强,等.青岛某市政用途全流程海水淡化厂工艺设计[J].中国给水排水,2023,39(4):47.
LUBiao,YANGZhi-feng,MAYan-qiang,et al.Process Design of a Whole-process Seawater Desalination Plant for Municipal Water Supply in Qingdao[J].China Water & Wastewater,2023,39(10):47.
[10]汪锐,胡惠秩,邵森林.通量对膜法除锰工艺净水特性及阻力变化的影响[J].中国给水排水,2023,39(9):26.
WANGRui,HUHui-zhi,SHAOSen-lin.Effect of Flux on Manganese Removal and Hydraulic Resistance in a Membrane?based Manganese Removal Process[J].China Water & Wastewater,2023,39(10):26.