LIUXiao-jun.Case Study on Deodorization Process of Yantai Taoziwan WWTP Phase Ⅰ Project[J].China Water & Wastewater,2022,38(10):130-133.
烟台市套子湾污水处理厂一期工程除臭工艺分析
- Title:
- Case Study on Deodorization Process of Yantai Taoziwan WWTP Phase Ⅰ Project
- Keywords:
- wastewater treatment plant; biological deodorization; ion purification method; biotrickling filter
- 摘要:
- 为实现烟台市套子湾污水处理厂厂区臭气的有效去除,基于该厂的水质特点和设计要求,选择BENTAX离子净化法耦合生物滴滤除臭工艺,投资约1亿元,测算运行成本为0.18 元/m3。详细介绍了该厂臭气处理工艺流程、设计参数及运行效果。监测结果表明,BENTAX+生物滴滤工艺能够显著去除污水处理厂产生的臭气,处理后的硫化氢、氨和甲烷等最高浓度分别为0.011 mg/m3、0.20 mg/m3和0.002%,满足《城镇污水处理厂污染物排放标准》(GB 18918—2002)的厂界(防护带边缘)废气排放最高允许浓度的一级标准。目前运行成本约为0.06 元/m3,显著低于预测值。
- Abstract:
- In order to achieve the effective removal of odor in Yantai Taoziwan wastewater treatment plant (WWTP), based on the sewage quality characteristics and design requirements of the WWTP, the BENTAX ion purification method coupled with biotrickling filter was selected. The capital cost is 100 million yuan, and the operating cost is estimated to be 0.18 yuan/m3. The odor removal process, design parameters and operation effect are elaborated. The monitoring results show that the BENTAX and biotrickling deodorization process could significantly remove the odor generated during wastewater treatment, and the maximum concentrations of hydrogen sulfide, ammonia and methane after treatment are 0.011 mg/m3, 0.20 mg/m3 and 0.002% respectively, meeting the first level criteria in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002). At present, the operating cost is about 0.06 yuan/m3, which is lower than the estimated value.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(10):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(10):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(10):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(10):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(10):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(10):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(10):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(10):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(10):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(10):81.