LEIPei-shu,LIQing,SUNJian,et al.Performances of Two Kinds of Subsurface Flow Constructed Wetlands for Treatment of Effluent from Secondary Biochemical Process[J].China Water & Wastewater,2022,38(15):115-120.
两种潜流人工湿地对二级生化出水的处理效果
- Title:
- Performances of Two Kinds of Subsurface Flow Constructed Wetlands for Treatment of Effluent from Secondary Biochemical Process
- Keywords:
- constructed wetland; vertical subsurface flow; horizontal subsurface flow; hydraulic load; effluent from secondary biochemical process; removal performance
- 摘要:
- 采用垂直潜流和水平潜流两种人工湿地处理武汉某污水厂二级生化出水,研究了不同水力负荷条件下污染物的去除效果,并进行了相关性分析。结果表明,两种湿地对COD、NH3-N、TN和TP的去除效果无显著性差异。在水力负荷为0.25 m3/(m2·d)条件下,两种湿地对COD和TN的去除效果较好;在水力负荷为1.00 m3/(m2·d)条件下,对NH3-N和TP的去除效果较好。相关性分析表明,两种湿地的水力负荷与TN去除率呈显著负相关关系,进水浓度在很大程度上影响着湿地的净化效果,同时各水质指标去除率之间存在一定的相关性。
- Abstract:
- Vertical and horizontal subsurface flow wetlands were applied to treat secondary biochemical effluent from a wastewater treatment plant in Wuhan. The removal effect of pollutants under different hydraulic loads was investigated, and correlation analysis was carried out. There was no significant difference in the removal efficiency of COD, NH3-N, TN and TP between the two wetlands. Both wetlands had better removal performances of COD and TN when the hydraulic load was 0.25 m3/(m2·d), and better removal performances of NH3-N and TP were obtained when the hydraulic load was 1.00 m3/(m2·d). The correlation analysis showed that there was a significant negative correlation between hydraulic load and TN removal efficiency in both wetlands. Pollutant concentrations in influent greatly affected the purification performance of the wetlands, and there were significant correlations among the removal efficiencies of water quality indexes.
相似文献/References:
[1]杜曼曼,张琼华,连斌,等.城市污水处理厂尾水人工湿地净化工程调试与运行[J].中国给水排水,2020,36(9):94.
[2]王晓云,蒋柱武,付爱民.UASB+两级人工湿地组合工艺处理农村污水[J].中国给水排水,2020,36(11):21.
[3]杜建强,杜滢明,张瑛,等.昆山珠泾中心河黑臭河道的系统施治设计与应用效果[J].中国给水排水,2020,36(12):129.
DU Jian-qiang,DU Ying-ming,ZHANG Ying,et al.Design and Application Effect of Systematic Treatment of Black and Odorous River in Zhujing Central River, Kunshan[J].China Water & Wastewater,2020,36(15):129.
[4]Jan Vymazal,卫婷,赵亚乾,等.细数植物在人工湿地污水处理中的作用[J].中国给水排水,2021,37(2):25.
Jan Vymazal,WEI Ting,ZHAO Ya-qian,et al.Counting the Roles of Plants in Constructed Wetlands for Wastewater Treatment[J].China Water & Wastewater,2021,37(15):25.
[5]邓敬轩,周润杰,单晓红,等.携菌新型生物质基材用于微污染水体治理[J].中国给水排水,2021,37(11):1.
DENG Jing-xuan,ZHOU Run-jie,SHAN Xiao-hong,et al.Biomass Substrate Carrying Bacteria for Treatment of Micro-polluted River Water[J].China Water & Wastewater,2021,37(15):1.
[6]管凛,陶梦妮,荆肇乾.人工湿地—微生物燃料电池强化尾水脱氮产电效能[J].中国给水排水,2021,37(13):7.
GUAN Lin,TAO Meng-ni,JING Zhao-qian.Enhanced Nitrogen Removal and Electricity Generation Efficiency of Constructed Wetland-Microbial Fuel Cells for Purification of Tail Water from Wastewater Treatment Plant[J].China Water & Wastewater,2021,37(15):7.
[7]许青兰,孔令为,沈浙萍,等.浙江省档案局微污染景观水体生态修复工程实例[J].中国给水排水,2021,37(16):108.
XU Qing-lan,KONG Ling-wei,SHEN Zhe-ping,et al.Demonstration of Ecological Restoration Project for Micro-polluted Landscape Waters in Zhejiang Provincial Archives Bureau[J].China Water & Wastewater,2021,37(15):108.
[8]王晓云,付爱民,李启明.曝气氧化塘+人工湿地组合工艺处理农村污水[J].中国给水排水,2021,37(21):64.
WANG Xiao-yun,FU Ai-min,LEE King-ming.Combined Process of Aeration Pond and Constructed Wetland for Treatment of Rural Sewage[J].China Water & Wastewater,2021,37(15):64.
[9]肖海文,刘馨瞳,翟俊,等.人工湿地类型的选择及案例分析[J].中国给水排水,2021,37(22):11.
XIAO Hai-wen,LIU Xin-tong,ZHAI Jun,et al.Type Selection of Constructed Wetlands and Related Design Case Analysis[J].China Water & Wastewater,2021,37(15):11.
[10]姜春杰.改良Bardenpho+粉末活性炭+人工湿地处理生活污水[J].中国给水排水,2022,38(2):93.
JIANG Chun?jie.Application of Improved Bardenpho, PAC and Constructed Wetland Process in Sewage Treatment[J].China Water & Wastewater,2022,38(15):93.