[1]张青文,余健.初雨调蓄池布置方式对管道沉积物污染控制研究[J].中国给水排水,2022,38(19):114-119.
 ZHANGQing-wen,YUJian.Effect of Initial Rainwater Storage Tank Layout on Control of Sewer Sediment Pollution[J].China Water & Wastewater,2022,38(19):114-119.
点击复制

初雨调蓄池布置方式对管道沉积物污染控制研究

相似文献/References:

[1]杨磊三,李骏飞,李德强,等.广东某污水厂二期扩建污水和初期雨水处理工程设计[J].中国给水排水,2022,38(24):47.
 YANGLei-san,LIJun-fei,LIDe-qiang,et al.Design of Phase-Ⅱ Expansion Project for Sewage and Initial Rainwater Treatment in a Wastewater Treatment Plant in Guangdong[J].China Water & Wastewater,2022,38(19):47.
[2]葛学伟,邓卫东,于宁.新建下凹桥区雨水调蓄泵站的优化设计[J].中国给水排水,2023,39(14):91.
 GEXue-wei,DENGWei-dong,YUNing.Optimal Design of Stormwater Regulation and Storage Pumping Station in Newly-built Concave Bridge Area[J].China Water & Wastewater,2023,39(19):91.
[3]王震,江竹青,李悦,等.基于MIKE+水质模型的径流污染控制研究[J].中国给水排水,2024,40(3):124.
 WANGZhen,JIANGZhu-qing,LIYue,et al.Control of Runoff Pollution Based on MIKE+ Stormwater Quality Model[J].China Water & Wastewater,2024,40(19):124.

更新日期/Last Update: 2022-10-01