FEIRong-xin,XIANGLi,HUANGChou,et al.Adsorption Removal of Phosphate in Wastewater by Metal-containing Salt Sludge Recovered from WWTP[J].China Water & Wastewater,2022,38(23):1-6.
污水处理厂金属盐泥资源化回收及其吸附除磷性能
- Title:
- Adsorption Removal of Phosphate in Wastewater by Metal-containing Salt Sludge Recovered from WWTP
- Keywords:
- wastewater treatment plant; metal-containing salt sludge; phosphate removal; resource utilization
- 摘要:
- 从污水处理厂末端气浮池回收原始金属盐泥,考察了其对水中磷酸盐的吸附性能,以及吸附剂投加量、再生液pH等因素对吸附性能的影响。结果表明,当盐泥投加量为0.3 g/L时,其释放的磷酸盐浓度也仅为(0.04±0.01) mg/L,远低于城镇污水处理厂一级A排放标准,更远低于城镇污水处理厂一般进水浓度(4~7 mg/L)。随着原始盐泥投加量的增大,对水中磷酸盐的去除率提高。当盐泥投加量为0.5 g/L时,对浓度为1 mg/L的含磷溶液去除率高达89.4%,且吸附过程更符合准二级动力学(R2=0.99)。原始盐泥对生化池进水和气浮池进水中的磷酸盐(分别为2.32、0.52 mg/L)均具有良好的去除效果,去除率分别为(54.5±1.4)% 和(26.2±0.8)%,表现出优异的除磷应用潜力。再生液pH显著影响吸附性能,且再生后的金属盐泥(pH=10处理)对磷酸盐的吸附去除率达到87.0%,显著高于原始盐泥(79.6%)。
- Abstract:
- This paper discussed the phosphate removal ability of the original metal-containing salt sludge recovered from the flotation tank of the wastewater treatment plant (WWTP), and further investigated the effects of the adsorbent dosage, the regeneration solution pH and other factors on the adsorption performance. When the dosage of salt sludge was set as 0.3 g/L, the phosphate released by the adsorbent was also only (0.04±0.01) mg/L, which was much lower than grade Ⅰ-A discharge standard of pollutants for municipal wastewater treatment plant and concentration of influent from WWTP (4-7 mg/L). With the increase of the original salt sludge dosage, the P-removal rate was also improved. When the dosage of salt sludge was set as 0.5 g/L, the removal rate of P-containing solution (1 mg/L) was as high as 89.4%, and the phosphate adsorption process by salt sludge could better be described by pseudo-second-order kinetics model (R2=0.99). The raw salt sludge had a good phosphate removal efficiency of (54.5±1.4)% and (26.2±0.8)% on the influent of biochemical tank (2.32 mg/L) and floatation tank (0.52 mg/L), exhibiting an excellent practical application potential for phosphate removal of real wastewater. The pH of regeneration solution significantly affected the adsorption performance,and when the pH was adjusted as 10, the phosphate adsorption efficiency of the regenerated salt sludge reached 87.0%, much higher than 79.6% of the raw salt sludge.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(23):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(23):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(23):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(23):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(23):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(23):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(23):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(23):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(23):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(23):81.