YANGLei-san,LIJun-fei,LIDe-qiang,et al.Design of Phase-Ⅱ Expansion Project for Sewage and Initial Rainwater Treatment in a Wastewater Treatment Plant in Guangdong[J].China Water & Wastewater,2022,38(24):47-52.
广东某污水厂二期扩建污水和初期雨水处理工程设计
- Title:
- Design of Phase-Ⅱ Expansion Project for Sewage and Initial Rainwater Treatment in a Wastewater Treatment Plant in Guangdong
- 摘要:
- 广东某污水处理厂二期扩建工程污水处理规模为15×104 m3/d,初期雨水处理规模35×104 m3/d。综合考虑占地面积小、投资省、运行稳定等因素,污水处理采用改良A2/O主体工艺,深度处理采用V型滤池,消毒采用次氯酸钠消毒;污泥处理采用低温热干化工艺;初期雨水处理采用高效沉淀池工艺。污水设计出水水质执行《城镇污水处理厂污染物排放标准》(GB 18918—2002)一级A标准和广东省地方标准《水污染物排放限值》(DB 44/26 —2001)一级标准的较严值,初期雨水设计出水水质执行《城镇污水处理厂污染物排放标准》(GB 18918—2002)中的三级标准。实际运行表明,出水水质完全达到设计标准。
- Abstract:
- The treatment scale of a wastewater treatment plant phase-Ⅱ expansion project in Guangdong is 15×104 m3/d, and the initial rainwater treatment scale is 35×104 m3/d. Considering the factors such as small footprint, low investment and operation stability, the modified A2/O process was selected as the main wastewater treatment process, while the advanced treatment process and disinfection were V-type filter and sodium hypochlorite disinfection, respectively. The sludge disposal process was low temperature thermal drying. The initial rainwater was treated by high-efficiency sedimentation tank. The design effluent quality of the wastewater is required to meet the stricter of the first level A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002) and first level criteria specified in a local standard of Guangdong Province Discharge Limits of Water Pollutants (DB 44/26-2001), while the design effluent quality of the initial rainwater is required to meet the third level criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002). Actual operation shows that the effluent qualities reach the design standards completely.
相似文献/References:
[1]胡坤,李龙伟,车爱伟,等.高效澄清池及V型滤池在孟加拉国大型水厂的应用[J].中国给水排水,2022,38(6):72.
HUKun,LILong-wei,CHEAi-wei,et al.Application of High Efficiency Clarifier and V-type Filter in a Large-scale Water Supply Plant in Bangladesh[J].China Water & Wastewater,2022,38(24):72.
[2]李久安,甄帅,陈明翰,等.给水处理构筑物叠合式布置工艺设计[J].中国给水排水,2022,38(14):60.
LIJiu-an,ZHENShuai,CHENMing-han,et al.Superimposed Layout Process Design of Water Treatment Structures[J].China Water & Wastewater,2022,38(24):60.
[3]杨祝平.长流程四级处理工艺用于准Ⅳ类排放标准大型污水厂[J].中国给水排水,2022,38(24):58.
YANGZhu-ping.Application of Four-stage Treatment Long Process in a Large-scale Municipal Wastewater Treatment Plant to Meet Quasi Class Ⅳ Discharge Standard[J].China Water & Wastewater,2022,38(24):58.
[4]刘林富.多模式A2/O+高效沉淀+V型滤池用于地下式污水厂[J].中国给水排水,2023,39(10):62.
LIULin-fu.Application of Multi-mode A2/O, High Efficiency Precipitation and V-type Filter Combined Process in Underground Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(24):62.
[5]关永年.BAF+ 高效沉淀池+V型滤池用于污水厂高标准提标改造[J].中国给水排水,2023,39(14):66.
GUANYong-nian.Biological Aerated Filter, High Efficiency Sedimentation Tank and V-type Filter for Upgrading and Reconstruction of a High Discharge Standard Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(24):66.
[6]王伟静,曹雪梅.河北省某南水北调水源高品质饮用水厂工程设计[J].中国给水排水,2023,39(16):89.
WANGWei-jing,CAOXue-mei.Design of a High-quality Drinking Water Plant with Source Water from South-to-North Water Diversion Project in Hebei Province[J].China Water & Wastewater,2023,39(24):89.
[7]曾超,刘影,陈圆,等.某再生水厂两期脱氮除磷工艺设计及效能分析[J].中国给水排水,2024,40(18):64.
ZENGChao,LIUYing,CHENYuan,et al.Process Design and Efficiency Analysis of Nitrogen and Phosphorus Removal in Two Phases of a Reclaimed Water Plant[J].China Water & Wastewater,2024,40(24):64.