[1]高彦博,杨忠启,周家中,等.BFM装配式用于占地受限型污水处理工程设计[J].中国给水排水,2023,39(2):46-51.
 GAOYan-bo,YANGZhong-qi,ZHOUJia-zhong,et al.Application of BFM Fabricated Structure in the Design of Land Limited Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(2):46-51.
点击复制

BFM装配式用于占地受限型污水处理工程设计

相似文献/References:

[1]朱点钰,陈年浩,朱津苇,等.填料类型对MBBR启动及运行效能的影响[J].中国给水排水,2018,34(21):1.
 ZHU Dian yu,CHEN Nian hao,ZHU Jin wei,et al.Effect of Carrier Type on Startup and Operating Efficiency of Moving Bed Biofilm Reactor[J].China Water & Wastewater,2018,34(2):1.
[2]郑临奥,吴迪,张晶晶,等.城市污水泵站改为河道生态补给站的实践总结[J].中国给水排水,2018,34(20):82.
 ZHENG Lin ao,WU Di,ZHANG Jing jing,et al.Practice of River Ecological Replenishment Retrofitting from an Urban Sewage Pumping Station[J].China Water & Wastewater,2018,34(2):82.
[3]郭莉芳,朱宇峰,滕良方,等.MBBR用于南方某污水厂强化脱氮效果分析[J].中国给水排水,2020,36(7):101.
[4]周家中,吴迪,郑临奥.纯膜MBBR工艺在国内外的工程应用[J].中国给水排水,2020,36(22):37.
 ZHOU Jia-zhong,WU Di,ZHENG Lin-ao.Engineering Application of Pure MBBR Process at Home and Abroad[J].China Water & Wastewater,2020,36(2):37.
[5]杨平,周家中,管勇杰,等.基于MBBR的AAO和Bardenpho工艺改造效果对比[J].中国给水排水,2021,37(7):11.
 YANG Ping,ZHOU Jia-zhong,GUAN Yong-jie,et al.Comparison of AAO and Bardenpho Processes Transformation Effect Based on MBBR[J].China Water & Wastewater,2021,37(2):11.
[6]孙庆花,张晓霞,赵益华,等.天津某高盐高排放标准污水厂提标改造工程设计[J].中国给水排水,2021,37(8):83.
 SUN Qing-hua,ZHANG Xiao-xia,ZHAO Yi-hua,et al.Design of a Wastewater Treatment Plant Upgrading Project with High Salinity Influent and High Discharge Standard in Tianjin[J].China Water & Wastewater,2021,37(2):83.
[7]周家中,宋平周,张爽,等.占地受限下北方某高标准新建污水厂工程设计[J].中国给水排水,2021,37(12):76.
 ZHOU Jia-zhong,SONG Ping-zhou,ZHANG Shuang,et al.Engineering Design of a New High-standard Wastewater Treatment Plant with Limited Footprint Area in North China[J].China Water & Wastewater,2021,37(2):76.
[8]陈如勇,张晓霞,周家中,等.MSBR改为三级A/O-MBBR连续流工艺的应用效果[J].中国给水排水,2021,37(14):108.
 CHEN Ru-yong,ZHANG Xiao-xia,ZHOU Jia-zhong,et al.Practical Application Effect of Retrofitted MSBR into Three-stage A/O-MBBR Continuous Flow Process[J].China Water & Wastewater,2021,37(2):108.
[9]王雪欣,毕学军,麻弛张,等.两点进水三段A/O-MBBR生物脱氮中试研究[J].中国给水排水,2021,37(17):62.
 WANG Xue-xin,BI Xue-jun,MA Chi-zhang,et al.Nitrogen Removal of Pilot-scale Three Stages A/O-MBBR with Two-step-feed[J].China Water & Wastewater,2021,37(2):62.
[10]周小琳,樊星,毕学军,等.两段式A/O-MBBR工艺生物脱氮中试与系统优化[J].中国给水排水,2021,37(19):72.
 ZHOU Xiao-lin,FAN Xing,BI Xue-jun,et al.Pilot-scale Test and System Optimization of Two-stage A/O-MBBR Process for Biological Nitrogen Removal[J].China Water & Wastewater,2021,37(2):72.

更新日期/Last Update: 2023-01-17