ZHUXiao-chao,FENGYa-bing,TAOHui,et al.Design of CAST Enhanced Denitrification and Phosphorus Removal Upgrading and Reconstruction Project in a Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(2):58-62.
某污水厂CAST工艺强化脱氮除磷升级改造工程设计
- Title:
- Design of CAST Enhanced Denitrification and Phosphorus Removal Upgrading and Reconstruction Project in a Wastewater Treatment Plant
- 摘要:
- 江苏某市政污水处理厂设计规模为2.5×104 m3/d,采用CAST主体工艺,出水水质执行一级B排放标准,为使出水水质提升至一级A标准,升级改造工程改造了原CAST工艺并增加了微絮凝过滤深度处理工艺。在CAST池生物选择区内安装曝气器,改为主反应区使用,同时解决了积泥的问题;主反应区内安装搅拌器、运行周期上设置缺氧搅拌时段,可提高系统脱氮效果;将剩余污泥泵单点排泥改为穿孔排泥管排泥,提升排泥效率;将旋流曝气器改为微孔曝气器,提高氧利用效率;在CAST池投加PAC同步化学除磷。工程完成后已运行1年多,出水水质稳定达到一级A标准。
- Abstract:
- The design scale of a municipal wastewater treatment plant in Jiangsu is 2.5×104 m3/d. The main process was CAST, and the effluent quality was required to meet first level B discharge standard. To improve the effluent quality to the first level A discharge standard, the original CAST process was modified and the micro-flocculation filtration advanced treatment process was added in the upgrading and reconstruction project. Aerators were installed in the biological selection zone of CAST tank, which were changed to the main reaction zone instead, and thus the problem of sludge accumulation was solved. The nitrogen removal performance of the system was improved by installing agitators in the main reaction zone and setting anoxic agitation period in the operation cycle. The single point sludge discharge of the excess sludge pump was replaced by the perforated sludge discharge pipe to improve the sludge discharge efficiency. The cyclone aerator was changed to microporous aerator to improve the efficiency of oxygen utilization. PAC was added to CAST tank for simultaneous chemical phosphorus removal. The project has been in operation for more than one year after completion, and the effluent quality has stably reached first level A discharge standard.
相似文献/References:
[1]俞勇,喻盛华,陈达钢,等.CAST工艺的脱氮除磷强化改造[J].中国给水排水,2020,36(12):125.
YU Yong,YU Sheng-hua,CHEN Da-gang,et al.Improvement of Nitrogen and Phosphorus Removal in CAST Process[J].China Water & Wastewater,2020,36(2):125.
[2]李亮.MBBR在CAST工艺扩容提质工程中的应用[J].中国给水排水,2021,37(20):87.
LI Liang.Application of MBBR in CAST Process Expanding and Upgrading Project[J].China Water & Wastewater,2021,37(2):87.
[3]姜鸣,石芳永,顾雪峰,等.工业园区污水厂准Ⅳ类水质提标改造工程设计[J].中国给水排水,2022,38(2):59.
JIANG Ming,SHI Fang?yong,GU Xue?feng,et al.Design of a Wastewater Treatment Plant Upgrading Project in an Industry Park to Meet Quasi?Ⅳ Surface Water Standard[J].China Water & Wastewater,2022,38(2):59.
[4]伍波,叶昌明,王小林,等.上向流反硝化深床滤池用于污水厂提标改造[J].中国给水排水,2022,38(4):103.
WUBo,YEChang-ming,WANGXiao-lin,et al.Application of Upflow DDBF in Upgrading and Reconstruction of a WWTP[J].China Water & Wastewater,2022,38(2):103.
[5]常尧枫,谢嘉玮,谢军祥,等.城镇污水处理厂提标改造技术研究进展[J].中国给水排水,2022,38(6):20.
CHANGYao-feng,XIEJia-wei,XIEJun-xiang,et al.Research Progress on Upgrading and Reconstruction Technology of Urban Sewage Treatment Plants[J].China Water & Wastewater,2022,38(2):20.
[6]冯仕训,张万里,程明涛,等.太湖流域一级保护区内某污水厂提标改造工艺设计[J].中国给水排水,2022,38(6):76.
FENGShi-xun,ZHANGWan-li,CHENGMing-tao,et al.Design of a Wastewater Treatment Plant Upgrading and Reconstruction Process in the First-grade Protection Zone of Taihu Lake Basin[J].China Water & Wastewater,2022,38(2):76.
[7]王建利,陈霖,魏寿廷,等.基于南方典型水质的奥贝尔氧化沟升级改造[J].中国给水排水,2022,38(16):96.
WANGJian-li,CHENLin,WEIShou-ting,et al.Upgrading of Orbal Oxidation Ditch Based on Typical Southern China Wastewater Characteristics[J].China Water & Wastewater,2022,38(2):96.
[8]周国标,吕银忠,郑望,等.工业园区污水厂出水提至地表水Ⅴ类标准改造工程[J].中国给水排水,2022,38(18):87.
ZHOUGuo-biao,LüYin-zhong,ZHENG Wang,et al.Retrofitting Project of an Industrial Park WWTP to Meet Level Ⅴ Surface Water Standard[J].China Water & Wastewater,2022,38(2):87.
[9]肖海文,覃文翊,翟俊,等.微藻光生物反应器在养猪废水处理提标改造中的应用[J].中国给水排水,2022,38(19):23.
XIAOHai-wen,QINWen-yi,ZHAIJun,et al.Application of Microalgae Photobioreactor in Upgrading and Reconstruction of Piggery Wastewater Treatment Process[J].China Water & Wastewater,2022,38(2):23.
[10]张方方,刘骁智,张波.A2O+MBR+臭氧催化氧化用于化工园区污水厂升级改造[J].中国给水排水,2022,38(20):61.
ZHANGFang-fang,LIUXiao-zhi,ZHANGBo.Application of A2O/MBR/Catalytic Ozonation in Upgrading and Reconstruction of Wastewater Treatment Plant in Chemical Industrial Park[J].China Water & Wastewater,2022,38(2):61.